According to approved work program of CPO-5 block in 2019 two exploratory locations were firmed up for drilling. But with the major discovery in Indico-1X well, brings up new scenarios for drilling of at least 4 wells in 2019 in NW part of the block. The joint development of Mariposa-1 and Indico-1X and possible lay out of oil pipeline increases the LAQ work by multiple times.
In SE part of CPO-5 block, 4 exploratory locations are lined up for early drilling within extended phase II period of the block.
Therefore, all relevant documents are needed to be in placed in order to guarantee the drilling and development of the block without any delay.
multiple times & without delay.