Winter Production16 Sep 2012 22:33
Hi Nigel,yes they will probably aim to produce some of the winter, i understand that they could go right through but perhaps with the upgrade going on will take a break in production,avoiding the worst of the winter. They could continue heap leaching but would have to insulate the heaps(testing on this was done last winter) as the SX EW plant was being built. I suppose they could cover the solution ponds if needed. What is important now is that FML issue a set of cost of production figures, they will do this after a decent run of settled production.There are miners pruducing at a cost of $5000/ton, we have a low cost surface mining,heap leaching operation using the latest equiptment available. It might be that we can produce copper at well under $3000/ton, if we can then we are in blue heaven!.There will certainly be interested parties waiting to see these production figures they are most important and are the reason for all the opimising and swiching circuits in and out.Am impressed with the methodical way in which KAZ COPPER has tackled this,i know as shareholders we would like everything to be done yesterday but it is important to get it right after all we have 30years of production ahead of us and millions at stake. Regards george.