Hasiba and Craignews
opinions vary on where the blame lies
where a contractor who has been employed to design, install and commission the plant, who has full automony over their order fails to delivery what is required, then the blame lies with them.
stark sold GR the dream and fooked up. Their design isnt fit for purpose, so additional plant was required and undersized plant has to be replaced
they advertise snicker chocolate bars on buses and taxis, but the buses and taxis dont sell them!! and the drivers wont know how they are made
watch the difference over at KOD and who they employ to build their plant
it wont be stark that is a fact
Moanygirl
You talk about personal attacks and how they have lost. Let’s talk about your personal attacks on posters where you
Criticise their spelling mistakes
Criticise their grammar
Criticise their point of view
Don’t come on here trying to play the victim in situations that you have caused
I have no time either on line or in real life for someone like you. I would tell you to your face.
I can tell just how arrogant and smug you are from what you type
It’s not your views I oppose, it’s how you always think you are correct.
Like I say, you’re not the victim here, you’re the maker of all this.
So moanygirl posted this and she thinks the major issue are the sorters
Martinigirl
Posts: 662
Price: 0.195
No Opinion
RE: Buy7 May 2024 21:44
Zulu is not capable and will not be capable of producing sufficient quantities of product with the current plant operations, it cannot and will not scale up until the major issue is rectified, the major issue being the sorters. George has clearly stated that the plant cannot be optimised until such time as the feed ore is of sufficient quantity and quality to allow it
when in fact, the main ISSUES are these
Ore Sorters
Milling and sizing
Magnetic separation and Tantalum recovery
Floatation Circuit
Ore body and plant grades
she doesnt have a clue what is going on or how one affects the other
she critcises GR when she is in fact like GR, waiting on information from those who know what the issues are
kettle and frying pan come to mind
All stark have done is left everyone to pick up their $h!t and to rectify it
what a pathetic excuse for a cowboy company
they say you are only as good as your last job
i can see stark going out of business after this
over a year late and still a design that doesnt work
i think that moanygirl is somehow tied to stark to direct all the blame at gr to try and cover their f. ups
even though it clearly states that stark are employed and paid to be responsible for the design, installation and commissioning of the plant to the design requirements, not once has moanygirl mentioned this, until now.
now all of starks f ups are showing and being mentioned, everyone knows who is to blame.
prem is a management company with no technical ability, that why they employed stark, as the professional team
since it was stark leading gr with the technicalities of the plant, that is what he relayed in the rns's and interviews. sometimes he may have got these wrong, and that why stark did an interview and promised the earth.
why employ a third party professional to oversee the works, when he has already paid for stark to do this!
he finally got that ****ed off with stark, he threw them off site.
he then employed other professionals who are now finding out what the plant issues are and they all point to stark's incompetence
canmax will see that this all lies with stark and you can bet your bottom dollar that they will be taking on board everything
Moanygirl
you have zero experience or knowledge in this field, so what you are saying is false
and dont say you can read between the lines, cos you cant
again, you are gossiping and putting gossip in others heads
have you reported Prem to the FCA yet
On a project such as this with all the design mess ups. The commercial side goes out of the window and can be recovered at a later stage.
The only priority is to sort the design issues and get the plant running to design capabilities but this takes time breaking down the individual issues to find out where the problems are. Prem are doing this with the new contractors as stark couldn’t do it. That’s why they were kicked off.
I think that canmax are not an unrealistic company in regard to third party designers. If they wanted to pull the plug on this, they have had many opportunities to do so.
So why haven’t they..??
Stark we’re employed to design,supply,install and commission the plant to the design output agreed and they haven’t completed their contractual requirements before their contract was determined by GR maybe for underperformance
I am not going to explain the technicalities but in short this plant has been under designed by stark who were kicked off by GR
GR as a CEO isn’t technically minded. He as relayed what stark have told him over the last 16 months.
If you are looking who to blame for misleading then blame stark.
I hope GR sues stark and sends them into administration
I also hope that stark are never employed again to design a lithium mine