Energy freedom in our country!23 Apr 2026 10:19
The Atmosphere Tower (58.4 m high, 3.2 m diameter, weighing 245 tonnes) which Mongolians have been waiting for many years, has been divided into 4 parts by ship from the port of Mumbai on the Indian Arabian Sea and headed towards Mongolia. 🇮🇳🚢➡️🇨🇳🛣️➡️🇲🇳 ️️
Heavy industrial, including petroleum-chemical industrial machinery, and equipment, are now manufactured and transported as a result of hundreds and thousands of people's knowledge, effort, time-consuming planning and engineering work.
Depending on the crude oil, the physical-chemical characteristics of the final product, the standards of the natural and climate in the country, each facility, equipment and parts are specially engineered and manufactured for the particular factory in accordance with the technical requirements.
The Kerosene refinery under construction in Mongolia is a high-tech factory with 12 process facilities and auxiliary, equipped with the most modern technology, for waste-free raw materials processing.
Thanks to Project Management Consultant Engineers India Limited , General Contractor Megha Engineering and Infrastructures Ltd managers, skilled engineers and professionals who are working together in this work that requires multifaceted involvement and effort.
https://www.facebook.com/Mongolrefinery