on the permit, please take time to read NRW website. Its perfectly normal for NRW to challenge Simec on areas they need clarification and this is built in to the normal planning process. There's absolutely no chance planning won't go through.
Following quotes are interesting: " If all legal requirements will be met, we must issue the permit or variation. We cannot refuse a permit or variation solely because of local opposition to the activity"
" If permitted to burn alternative fuel, the plant will have to meet emission limits for all emitted air pollutants. These will be the same, or in many cases considerably lower, than current limits when burning coal"
We will have planning granted in the next month or two, December at the very latest.
Not teaching people to suck eggs here but remember we also have an incredible tidal division here