Realistic or cost effective1 Apr 2021 14:07
Longonjo mineral upgrade to 313m Mt, 4.4m Mt being ree, 990k Mt being ndpr, round that to 1m Mt ndpr, that gives Longonjo ndpr worth 75b,interesting but is it cost effective to mine or sift through 313m Mt of material for 4.4m Mt reo, 990k k Mt of that being ndpr?