RE: RNS out20 Nov 2020 08:50
I'm happy enough with this update. They have secured an operation base, drill manager ready to go, rig on site ready to go, geochemical analysis complete and they know what they want to drill and permits in place. What's not to like?
In terms of timescales, given the above I would have thought 1-2 weeks before the drill starts turning. In addition, no mention of depth but it does state there is some anomalies that head under cover therefore there may be some mineralisation at shallow depth. Therefore, they are going after any remaining low hanging fruit first (which makes sense). If they can find anything above 50m depth with a good resource then we'll be looking at producing very soon.
No mention of number or location of drilling at HR3 or Cherry Tree but this has been answered previously. As they have their own rig, they can start drilling and follow the gold or system. Cherry Tree might show up nothing after first 2 holes then they'll move to HR3. If Cherry tree looking promising then they might spend a few months sinking 20 holes and massively prove up something interesting.
They have their own rig so its going to be flexible.