RE: Another £120K13 Jan 2021 10:07
Another great interview yesterday. Very exciting as usual an all heading in the right direction. If we can prove any sort of Fosterville style mine at Bailieston then we will all be very well rewarded. (Never mind Creswick) and the additional reefs they are looking at.
Craig noted in the interview that a contractor drill hole will cost circa, £10-12k. He did not say what depth but assume he is referring to our HR3 drill holes therefore 200mm depth.
My thought are that as this is our own rig which will be used continuous, we will be able to drill a 200m deep hole for £7k. That's £35 per metre.
I would expect that 60,000m drill is required to prove up something really meaningful therefore £35 x 60000 = £2.1m. Or 100000m of drill £3.5m
Therefore, any dilution will be very minimal from here. By the time we have drilled 60-100k metres the value should be alot higher. Any dilution at this stage for corporate items, further drilling or even mine development will be at higher SP and less dilutive. (assuming we find what we are looing for)
Looking forward to the drill results streaming in over the coming weeks/months and potential use of second rig.