RE: Missing 25Mt17 May 2021 08:14
I have been trying to understand how much of the Cheyeza and Muswema structures the new surveys would cover. Interestingly as far as I can tell the Feb call said 45,700 line km(a heck if a lot!) and the latest call said 5,200 line km. The latest number is more believable but still a large survey area (about 260 km2). It looks like cost of this may be somewhere over $100 a km. I wonder if the Feb number was an error as it seems massive. I think both were around 13mins into the calls.