RE: Realistic worst case11 Jun 2021 17:25
The latest long section diagram appears to show that drill 2 and 3 went either side of drill 1 somewhere around 550 R.L. metres. I am assuming the mineralisation for drill 1 is correct, in that there is reasonable mineralisation along most of the length. Trying to visualise where drill 1 would come through on the cross section diagram I have convinced myself that holes 2 and 3 and the cross section diagram may present a less optimistic view than could exist as a wider picture. I may well be deluding myself. I wonder if we will get a more detailed model with the next assay results - I assume drill 1 tells more of the story than we currently know.