Q118 Jun 2018 20:36
RNS dated 17th April for SOLG
Ø Drilling at Alpala continues to extend the high-grade mineralisation (which is expected to also extend the high grade resource) along the southwestern margin of the Alpala Central Deposit, as indicated by Hole 42, from which partial assay results have thus far returned 846m @ 1.02 % CuEq, including 504m @ 1.28 % CuEq, both open at depth and awaiting remaining assay results.
Ø Infill drilling within the high-grade core of the Alpala Central Deposit is expected to significantly increase the high-grade resource tonnage, as shown by Hole 43 (974m @ 0.71% CuEq, including 478m @ 1.02% CuEq), and Hole 41-D1, which has thus far intersected approximately 688m of visible chalcopyrite mineralisation from 1003.8m depth (drilling continues and assay results pending).