RE: Q & A13 May 2020 14:28
Got to be worth 1 p................Lets see the results of the Q&A but 1p really!
First well (TE-6): During the first half of 2016, the first Tendrara well, TE-6, was drilled to a measured vertical depth of 2,665 metres and successfully encountered approximately 28 metres of net gas pay in the TAGI reservoir. Flow was achieved pre-stimulation and, post-stimulation, a rate of 17 MMscf/d was achieved. This highly commercial rate was significantly above initial expectations.
Second well (TE-7): the Company’s second Tendrara well (TE-7) was drilled successfully to a total measured depth of 3,459 metres, corresponding to a vertical depth of 2,611 metres. TE-7 has a total contact length through the TAGI reservoir of some 837 metres, including a 700 metres sub-horizontal section. A gas flow rate was achieved, post stimulation and clean up, of 32 MMscf/d. This rate was significantly above the Company’s pre-drill expectations. In January 2017, a successful extended well test was completed. The extended test results are consistent with the Company’s estimates and confirm the good deliverability of the TAGI reservoir, the horizontal well concept and the Company’s view of the significant potential of the field.