Future projection14 Oct 2018 20:50
·     Two further PEDL234 KL drilling sites finalised, both located within the thickest, most thermally mature and oil generative area of the KL deposit. Planned 2019 drilling campaign scheduled after 2018 Horse Hill testing and drilling programme completion.
Horse hill site further sites to expand in licence area
Bradford bridge
Plus 2 more sites suited for pld234
Near term four sites the could be all drilled and tested with in 5 years could have a minimum of 36bpd. Bais of 3.5k per well 6 wells per site across these two licences alone if all proves up