RE: Malaysia PSC announcement23 Jun 2026 18:00
I was looking over drilling costs for Temaris, 5 million for Tembakau 1, 8 million for Mengkuang, 15 for Tembakau 2. Ofcourse there will be extra costs associated with Tembakau 2 due to the well testing.
Overall bodes well for a cheap as chips development, if these guys get it right then it could be 20,000 boepd for not very much at all.