RE: in the ground value17 Dec 2020 13:30
Woodster, $2.2b based on below which assumes we are using the chemical plant to process the tio2 into pigment grade product. Both iron and tio2 prices are up circa 20% from those figures. Plus the current drilling programme is targeting circa 15m/t up from the current 5.3m/t.
Inground value maiden resource
Current drilling targeting trebling of below..
Commodity Resource Price per tonne Value
Tio2 pigment 575,457 $2,500 $1,438m
Vanadium 28,990 $15,000 $435m
Iron ore 2,876,331 $120 $345m
Total $2,218m
$2,218,000,000
Gold equivalent at $1881 =1,179,160 Oz (7.1g/t grade)
Copper equivalent at $6940 = 319696 t (6.03% grade)