Snippet from PANR rns18 Aug 2022 09:11
Pretty relevant regarding lead times and costs:
Drilling operations at the Alkaid #2 horizontal well bore have now concluded, reaching a total measured depth of 14,300 feet ('ft') which includes a lateral length of 5,300 ft. A 5 ½ inch liner has been run, set, cemented at the bottom and tested for integrity. Pantheon, like all companies in the oil and gas industry, is experiencing significant inflationary cost and supply chain pressures at present, and hence is extremely pleased that drilling of the lateral section was accomplished smoothly and without incident.