RE: Rns at 7am ??28 Jan 2019 07:35
They where hoping to release Djeno news before the end of this month, i believe they where approx 250 meters away from Djeno but i am presuming that this is vertical depth from seismic, so if we are drilling acutely i.e. horizontally then this can become 2 fold i.e. 500 meters or more, they have directional drilling capabilities so they can probe around confirming different geology from produced cuttings, they also if true slowed down due to pressures observed. Drilling penetration was est 50 meters per day, i would say average 30 MPD and include the 500 meters thats say 17 days. They have a great opportunity here to gather as much data as possible for future drills.