RE: Justification RNS?10 Apr 2024 10:44
Peeps.....!
"This study has commenced with several processing facility options already being reviewed. These will include a smaller, lower rate pilot plant that would allow for early production as well as larger, modular systems that can be scaled-up."
They are just looking into "several" options, and have got the ball rolling re:design before actual flow rates are confirmed by EWT........! :)
read the para above and......
"The Company has also commenced above-ground engineering studies and, following a detailed review of several companies, has now selected one to produce a preliminary design for a production system that will be suited to the flow rates and gas composition within the Rukwa Basin."
better they progress the design now than after dotcha fink.......! :()
anywho, what flow rate would be required to supply a " smaller, lower rate pilot plant that would allow for early production".........? :)
All the best (anyone...........? :()