RE: EA Responses11 Oct 2021 13:30
Yes. I don’t think they will follow up with the side track well. As it’s a risk for delay’s.
As for the construction your on about. The pipeline. Is not miles. It’s 750 meter extension to what’s already in place.
The keys parts of the project are to install processing facilities on the existing Saltfleetby site to ensure gas is at the required pressure, temperature, and specification to be sent to the National Grid, and to install a short export pipeline extension of some 750m to connect the field directly to the National Transmission System. Work is underway to complete these projects with the aim to bring the field onstream in early 2021.
But your right. There is a element of construction. If that’s what you call a few concrete pads.
I personally think the EA. Will not push this back. If anything happens I think they will support Angus to carry this forwards. After all the are only reopening a site. Gla.