RE: NEW Q & A18 Jul 2018 17:15
“The suspension operation was designed to maximise flexibility for the future use of the wellbore”
Would waiting an extra couple of weeks to remove more stimulation fluid have diminished our maximum flexibility that much, or had ye given up that it would never flow in current conditions?
Was the maximum flexibility higher last year before the shut in, in hindsight when was the maximum flexibility?