SS announcement out on JSE11 Mar 2019 07:06
Estimated economic forecasts for the Toral Project, based on the current level of work (+/-
30%), for the Conceptual Scenario 2a comprise:
o US$110 million net present value (NPV) using a discount rate of 8%;
o 24.4% internal rate of return (IRR);
o Estimated US$33 million CAPEX for a proposed 450ktpa design capacity plant,
including associated auxiliary costs, with infrastructure being situated near portal
entrance on the north side of the deposit.
o Estimated total CAPEX of US$110 million.
o US$25 per tonne indicative OPEX processing cost at steady state conditions.
o US$36 per tonne indicative OPEX mining cost utilising mechanised cut and fill.
o 15-year production plan, with significant potential for extension.