RE: Ntorya development, how many wells ?11 Oct 2019 12:55
sorry from the EGM circular
http://admin.aminex-plc.com/uploadfiles/181207_%20EGM%20Circular%20(web%20version).pdf
also, I believe at least 25m was perforated at NT-2 prior to the well test, and reading the RPS Energy report on the results, makes you wonder, just what the flow rate would had been if it wasn't damaged by mudding up due to the high pressures.
" In addition, a PLT was run for the Ntorya-2 well which revealed 78% of the flow was coming from two metres on the upper part of the perforations (2,593 to 2,595 m MD) (Figure 5-9). The Operator attributes this to the ineffectiveness of the clean-up of the well, which prevented the whole interval from producing. The Operator expects a higher deliverability during development. However, RPS is only considering the deliverability demonstrated in the existing tests for this Report"