Madman rob, great correlation of readily available data👍25 Nov 2025 11:44
PRD have made available to Scorpion Geoscience an extensive database comprising well reports, 2D
seismic data and technical reports relevant to the Guercif licence.
MOU-2 was drilled to 1,260 metres Measured Depth before being suspended for operational reasons for a possible later re-entry.
Three gas samples collected whilst drilling.
100 metres of variable quality sand in primary target.
· MOU-3 was drilled to 1,509 metres Measured Depth and completed for rigless testing.
Seven gas samples collected whilst drilling.
50.5 metres of gross sand interval in primary target.
Secondary targets Ma and TGB-6 sand intervals confirmed to be present and gas-bearing based on NuTech petrophysics and gas samples collected whilst drilling.
Ma and TGB-6 intervals correlated with MOU-1 drilled in 2021 to potentially define a single structure covering up to 21 km2.
11 metres of unexpected sand encountered at shallow depth with over-pressured gas.
Formation damage predicted due to necessity to drill with heavy drilling mud - to be potentially penetrated using Sandjet rigless testing technology.
· MOU-4 was drilled to 1,199 metres Measured Depth and completed for rigless testing.
Unexpected 58 metres of gross M1 Sand potential reservoir interval, interpreted by NuTech as gas-bearing.
21 metres of gross sand in primary target with improved reservoir characteristics compared to MOU-3 and interpreted as gas-bearing by NuTech petrophysics.
MOU-3 and MOU-4 confirmed potential for stratigraphic trap covering 68km2 for the primary Moulouya Fan target.
MOU-4 achieved its secondary objective by defining the edge of the Jurassic carbonate prospect located to the east of the MOU-4.
20th February 2024
Analysis of gas samples confirms up to 99.57% methane suitable for CNG development.
Mou-5
Domerian carbonate primary target penetrated supporting pre-drill play concept
50 metre interval under petrophysical and petrographic review
100 metres below crest of Domerian carbonate bank culmination
· Helium show above primary target
· Never before seen 30 metre good quality gross sand below Domerian.
MOU-5 drilling results have importantly established for the first time the presence of Triassic salt in this part of the Guercif Basin.
The gas is certainly there.
The trolls argument is that we have not produced anything.
Management comments is:
There is enough data available to sell.
What is undeniable is:
We have found gas in multiple logs. Our well engineer says the gas could flow with the right treatment on Mou-3.
He would not say anything like that if there was no gas.
Formation damage has been the issue to date.
Our next well will use all available data and drilling technology to overcome the enormous amount of gas pressure.