RE: Dukas well.16 Apr 2019 08:58
I think about 30 days....
UPDATE (EP-115)
Central Petroleum Limited (ASX:CTP) (“Central”), as Operator is pleased to announce that the Surprise-1 well was spudded at 1130 hours CST on 11 October 2010 by MB Century Rig 7.
The rig is expected to take approximately 30 days to drill the well to a total depth of approximately 3,000 meters. A depth versus time curve is for the well is attached to this announcement.
A summary of the Surprise-1 Prospect is as follows:
Primary target: Oil in the Pacoota & Stairway Sandstone Formation
Primary target size: 50 million bbls oil in place
Location: Longitude 23 degrees, 42 minutes 50.758 seconds South and Latitude 129 degrees 59 minutes 36.091 seconds East
Target chance of success: 29% (supported by live oil in Johnstone-1)
Formation depth main Pacoota Sandstone Target : 2,600 meters
Equity Interest: Frontier Oil & Gas Pty Ltd (a Central wholly owned subsidiary) (90% and Operator), Trident Energy Ltd (10%)
Should hydrocarbons be discovered, and the wireline logging results are positive, it is planned to evaluate the reservoir(s) by conducting flow test(s).
Mr John Heugh, Managing Director said “We are pleased to spud Surprise-1 following the extensive oil shows encountered in Johnstone-1. Whilst the Johnstone-1 flow rates were disappointing, Surprise-1 is located and closer to the regional source kitchen in