RE: New Presentation Uploaded12 Jul 2022 15:45
Steward
Surely the 8-10MT indicated is just for the initial pit for the pilot mine and the DSF for the larger Zulu area, incorporating the ~25000m will follow in due course when the assay results have been provided and the model run to provide the numbers?
In a way it is likely the 8-10Mt target for the Pilot Plant is nothing more than a red herring and will actually cloud the bigger picture rather than provide a stimulus for the share price, in my opinion.
Happy enough with the presentation and hopefully the modules which make up the plant are available off the shelf rather than needing bespoke design and fabrication. That is where issues can present themselves and where most of the risk sits, along with programme.
Disappointing to see SP down down and the volume being so poor. I would have expected the volume to have picked up given the positive feedback from those who attended.