RE: Best bargain10 May 2022 13:23
BBB79 watch the podcast again (if you can bear it)
Facts..
1. Train is ready
2. Track is ready
3. Coal is being produced
4. Washplant is fully functional
5. Clean coal is stock piled (lots of it)
Ask yourself what is at the other end of the railway line? Its a ship, one that will take a lot of coal.
Ask yourself about global shipping and the challenges of schedule and availability of vessels.
The train can't go until the ship is in the Dock (no point moving a stock pile from onelocation to anther, only to have to reload on a ship when it arrives).
I would guess that Bens terms will negotiated to dock/ship, but they won't be reponsible for said ship, and its arrival.
There is uncertainty in shipping. But the certain things in place (1-5 above) are in control by Ben.
When the ship arrives, two days is all it takes to fill it, was the certain message I took from the Podcast.