Producing Gas24 Apr 2023 14:40
Based on the results we have concluded that at present, the well is capable of 4-5 mmscfd at a FWHP of 30 barg flowing into the system with the two other wells. We are expecting the well to clean up further which is likely to raise that flow rate in the future. Whilst producing through a temporary connection, the new well flowline will be constructed to enable full plateau production this summer.I think the temporary connection is to the flare,when the new flowline is constructed and installed we will see the Gas going to the grid,full plateau production this summer,RNS SAYS IT ALL REALLY.