RE: RNS out3 Feb 2022 09:29
Anything above 569 is an improvement, I'm only expecting 1,000 oz for December and nothing else. Improvements can be made beyond "Oz's produced and Sold". Look at Hummingbird hitting 80,000 oz levels in 2021, but a ridiculous AISC, thats why the Market isn't reacting as it should. Getting those costs down is equally important to the bottom line, growth and future prodit
"· Commencement of construction of a new heap leach plant operation, which will initially be loaded with approx. 40,000t of currently stockpiled low-grade material, and thereafter treat up to 10,000t of ore monthly from low-grade open pit and low-grade underground ROM feed."
- A master stroke, which I've mentioned before. It makes even more sense now knowing there will be a 6 week blackout period with the mine, as the new ball mill comes online. The Heap Leach is loaded with an acid, and usually works on Carbon recovery based process, which if I'm right, can still run whilst the CIL plant is down. Tailings and low grade material as the recovery rate is a lot lower, around 70%. And when the Heap Leach and CIL plant are running side by side, with a new Ball Mill, the oz's will dramatically increase.
"· Work on the detailed engineering design for the accelerated development plan has already commenced, with the appointment of an experienced engineering company to implement the works programs to be made following final site inspections to be undertaken later this week with the Company's newly appointed General Manager, Mr Riaan Lombard."
- Ties in very well with the ongoing expansion at Kilimapesa
More CIL tanks to keep up with new levels of throughput and activity within the plant
Expecting at some point during Q2, maybe Q3, for the downtime and implementation of the upgrades.
"The development and operational actvities are forecast to increase annual gold production to approx. 24,000oz and also improve operational efficiencies " - May give us an insight into the extra oz's that the Heap Leach will give us for production. With the new Ball mill, 1,500 oz predicted giving annual returns of 18,000 oz. Will the excess 6,000 oz come from the Heap Leach? Maybe. Time to get excited