RE: This is surely a typo right?17 Dec 2018 11:52
Rufus replied within minutes, but I needed to get consent before I posted his reply.
Hi A***, Basically by just having the second loader operating at site it will give an increase of estimated 400t of washed product per month. This is nothing to do with the plant upgrade or any other mining increases. It is simply making daily operations more efficient by being able to load plant and customers simultaneously, ie: not having to stop one to do the other. Then when the screen operates the two loaders will be at maximised usage loading screen, plant and customers. I hope that makes it clearer. Thanks Rufus’