RE: Star Valley Drilling Rig #101 fastest rig in Morocco18 May 2021 18:25
GRH/2D
I read it as two separate drills from the same third location.
RNS has it as " KSR-18, is a dual target well, with the first in the Guebbas reservoir at 1,600m and the second in the Hoot reservoir at around 1,790m."
Unless as you say it is a stacked drill to do both at the same time?? Thoughts?
If it is only 3 then they could well be done by beginning of June