RE: Ceg30 Sep 2022 08:11
3 big RNS to read on CEG. I haven't read all off them!
"Inniss-Trinity Field
The Group owns and operates 100% of the Inniss-Trinity field by way of an incremental production service contract ("IPSC") with Heritage. The IPSC has been extended to 30 September 2022 on an interim basis to allow for ministerial consent required for execution of a fresh EPSC effective 1 January 2022 and expiring on 30 September 2031. Within the field, regular well workover operations are undertaken on the existing production well stock, including well stimulation operations, reperforations, and repairs to shut-in wells, as and when appropriate. As with the Goudron field, the Group has identified certain well recompletion opportunities and is undertaking a comprehensive well optimisation and swabbing programme with the objective of achieving production stability, growth and longevity, and reduced field operating costs. During 2020 and 2021, a CO2 enhanced oil recovery pilot project was undertaken on the field and the Group continues to undertake technical work to evaluate potential to undertake further CO2 projects in other parts of the field."