RE: Sp one more day to go1 Aug 2018 10:40
19th July Echo provided map via twitter showing the test rig "nearly" at its destination, assuming a couple of days to set up and get started lets assume testing underway on the 23rd at the latest, as of today that allows 10 days for testing, not sure this is enough time for testing so expecting results tomorrow (2nd) may be a bit optimistic, could also be that extended tests are required if the well proves better than expected results, however results are certainly imminent, should these results bear out the optimism shown by the board then there must surely be a very welcome increase in share price with three wells still to test including 1001 with the additional oil column, good days/weeks/months ahead for sure