FTSE, yes H1 could be radial drilled, as for production increase i will not be drawn but the whole point of RJD is to increase production, plus with the new 3d seismic we may get a better idea of where the oil at GOBI has migrated to so radial drill of GOBI could put us much closer to the sweet spot.
The real beauty are the costs, H1, H2 & GOBI are already drilled, to go back in and radial drill should not be that expensive, we are waiting on costs right now, see question 3 below from the recent Q&A.
.............................................................
Question 3:
What would be the cost, timeframes to implement and potential increased flow upside to any prospective production enhancement techniques, such as the radial drilling?
Jerry Answer: As, I said a couple of times now, we are waiting for costings, for the contractors for radio radial drillings. There are experienced contractors available in China, so we could potentially, mobilise quickly if a small job in, Mongolia were to incentivize them, and or we can combine this with other work, that we can do. Regarding the aspiration for those work, well, clearly it's depending, on the, on the type of technology we deploy, and the contractor, but the contractors sort of showcase presentations and documentation, so it should say that actually rates of up to 1,000% increase, can be achieved, but obviously that's their best case scenario, but I would expect several folds over of increase in production if the technology works.