RE: Prem20 Aug 2025 07:08
Fantastic news
The second phase of the OEM plant test run has now been completed with positive outcomes to the extent that the plant is now able to run continuously as intended and is now commissioned such that all plant components operate and are integrated and automated to support the ongoing optimisation necessary to continuously meet saleable concentrate grade. Both the OEM and Zulu are satisfied with the significant progress made.
Saleable concentrate requires a spodumene concentrate with more than 5% Li2O ("Saleable Concentrate"). The plant at Zulu has achieved Saleable Concentrate on numerous occasions with grades up to 6,2% Li2O, and the result of ongoing optimisation is expected to be that this is achieved consistently.