focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Share News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

President Energy progresses in Argentina, faces delays in Louisiana

Wed, 22nd Sep 2021 13:00

(Sharecast News) - President Energy announced a drilling and workover update on a number of its assets on Wednesday, reporting that at the Puesto Guardian concession in Argentina's Salta province, it has signed a drilling services contract for three firm wells to be drilled before the end of the year.
The AIM-traded firm said the contract also included an option to retain the rig into the New Year for a further two wells, after drilling the third firm well.

It said that would enable continued drilling in the concession, should the results from the ongoing seismic reprocessing confirm two additional prospects that had previously been identified.

The first three wells would be drilled in the Dos Puntitas field, and the two contingent wells for 2022 in the Pozo Escondido field.

Each well was estimated to cost $3.5m and have a drilling time of 45 days, with a mean success case initial projected oil production of 40 cubic metres, or 250 barrels of oil, per day.

Site clearance for the first well had now started, with the rig due to be mobilised in early October.

Drilling of the first well was now expected to begin by the end of the third week in October, with drilling of all three wells set to be completed by the end of the year, with the final well in that sequence expected to be on-stream in the first part of January.

At the Triche and Simmons 2 wells in the US state of Louisiana, meanwhile, President said both of those wells remained offline, as they had for the last three months, awaiting workover of the Triche well to reinstate production.

The operation of the Triche well was required for the Simmons 2 well to operate, as the Simmons 2 well used the gas produced from the Triche for gas lift.

It said the Triche well had not performed optimally all year due to the progressive breakdown of the downhole gravel pack in the well used to constrain sand production.

The board said the "frustrating delay" in fixing the problem had been "materially exacerbated" by the effects of Hurricane Ida, which devastated the locality.

A rig was now available, but the company said it was awaiting barge availability.

It said it hoped that the workover would be completed by the end of October, and that the wells would work at the same levels as last year, being 300 barrels of oil equivalent net to President, with half being oil.

Realisation prices were "robust", with oil currently at about $70 per barrel, while reserves levels were unaffected, with lower-than=expected depletion due to the constrained production.

"We look forward to the drilling campaign in Salta," said chairman Peter Levine.

"With current prices there comparable to Rio Negro and fixed operational expenditure already covered by existing production, the incremental production will make a good contribution to group.

"Louisiana, for various reasons out of our control, has been frustrating for much of this year."

However, Levine said the firm was "close" to being back on track.

"Nevertheless, the events have given management cause to assess the future of our Louisiana assets within the group, and we will do so at or around the end of the year once the wells are back online and have been producing for a period."

At 1119 BST, shares in President Energy were down 2.22% at 1.71p.
More News
26 Nov 2020 14:39

IN BRIEF: President Energy Hails Testing Success At Rio Negro

IN BRIEF: President Energy Hails Testing Success At Rio Negro

Read more
26 Nov 2020 10:34

President sees success in testing shut-in well at Las Bases

(Sharecast News) - President Energy announced testing success at the old shut-in well 'LB-1', at Las Bases field in Rio Negro, Argentina on Thursday, reporting that workover and testing of the shallow Centenario interval in the old shut-in well was a follow-on from the successful newly drilled well LB-1001.

Read more
16 Nov 2020 17:30

IN BRIEF: President Energy Notes Encouraging Results From EVN-x1 Well

IN BRIEF: President Energy Notes Encouraging Results From EVN-x1 Well

Read more
16 Nov 2020 12:05

President Energy upbeat on exploration well testing

(Sharecast News) - President Energy updated the market on the testing of exploration well EVN-x1 near the main Estancia Vieja field in Argentina's Rio Negro province on Monday, having announced the well's logging on 27 October.

Read more
2 Nov 2020 14:17

Russia to discuss three-month delay to tapering oil output curbs

(Sharecast News) - Crude oil futures rallied from their intraday lows after reports that Russia was considering postponing plans to taper the oil output curbs now in place by three months.

Read more
27 Oct 2020 15:50

IN BRIEF: President Energy Finds Promising Signs At EVN-x1 Well

IN BRIEF: President Energy Finds Promising Signs At EVN-x1 Well

Read more
26 Oct 2020 19:03

IN BRIEF: President Energy Says CGC Invests USD165,000

IN BRIEF: President Energy Says CGC Invests USD165,000

Read more
26 Oct 2020 13:51

President Energy pleased with drilling progress at Las Bases

(Sharecast News) - President Energy updated the market on the newly-drilled well 'LB-1001' on Las Bases field in Rio Negro, Argentina on Monday, reporting that net gas pay had been re-calculated at an increased 70 metres over several intervals.

Read more
26 Oct 2020 10:16

President Energy Lauds Las Bases Well Results But Posts Interim Loss

President Energy Lauds Las Bases Well Results But Posts Interim Loss

Read more
15 Oct 2020 05:56

IN BRIEF: President Energy Continues Field Development In Argentina

IN BRIEF: President Energy Continues Field Development In Argentina

Read more
14 Oct 2020 13:36

President Energy begins new drilling in Rio Negro

(Sharecast News) - President Energy updated the makret on its drilling operations at the Estancia Vieja and Las Bases fields in Rio Negro, Argentina on Wednesday, reporting that drilling had started at EVN-x1.

Read more
12 Oct 2020 14:04

Oil output from US Gulf and Libya's El Sharara recovering

(Sharecast News) - Crude oil futures slipped lower at the start of the week as production restarted in the US Gulf of Mexico after Hurricane Delta left the region and amid reports that output from Libya was coming back online more quickly than anticipated.

Read more
7 Oct 2020 18:20

UK TRADING UPDATE SUMMARY: Gym Group Fighting Fit With Fresh York Unit

UK TRADING UPDATE SUMMARY: Gym Group Fighting Fit With Fresh York Unit

Read more
22 Sep 2020 19:37

IN BRIEF: President Energy Making Progress At Rio Negro, Argentina

IN BRIEF: President Energy Making Progress At Rio Negro, Argentina

Read more
15 Sep 2020 22:08

UK TRADING UPDATE SUMMARY: Mortgage Advice Bureau Launches Later Life

UK TRADING UPDATE SUMMARY: Mortgage Advice Bureau Launches Later Life

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.