Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Share News (MATD)

Share Price Information for Petro Matad (MATD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.05
Bid: 3.00
Ask: 3.10
Change: 0.00 (0.00%)
Spread: 0.10 (3.333%)
Open: 3.05
High: 3.05
Low: 3.05
Prev. Close: 3.05
MATD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Petro Matad disappointed by drilling results from Red Deer-1

Tue, 17th Sep 2019 10:45

(Sharecast News) - Mongolia-focussed oil explorer Petro Matad announced drilling and logging results from the Red Deer-1 exploration well located in the south of Block XX on Tuesday, as well as an operational update for Heron-1 and Gazelle-1 in the north of Block XX, in eastern Mongolia.
The AIM-traded firm said Red Deer-1 had been drilled with Daton Petroleum Engineering and Oilfield Service's 'Rig DXZ1' to a total depth of 2000 metres.

It said no hydrocarbon bearing zones were identified during drilling, which was confirmed with wireline logs.

The well would now be plugged and abandoned.

Petro Matad added that the Lower Tsagaantsav primary reservoir target was encountered at 1632 metres - 30 metres shallower than the pre-drill prognosis - and comprised a thick interval of good quality sandstones interbedded with claystones.

Drilling gas values remained low throughout, with no increase and no significant oil shows observed upon entering the reservoir target.

The company said petrophysical analysis of the wireline log data confirmed the absence of hydrocarbons.

Analysis of drilling gas data suggested the presence of potential source rocks shallower in the drilled section, but the firm said the absence of significant oil shows indicated that those source rocks were not fully mature for hydrocarbon generation in the vicinity of the Red Deer prospect.

The board said well abandonment operations were now beginning, and upon completion the rig would move out and the well site restored to its pre-drill condition.

Petro Matad confirmed the well was drilled on budget, with a total cost of less than $4m (£3.23m).

In the northern part of Block XX, at Heron-1, the company said the casing operation had been completed and the well temporarily suspended.

Mobilisation of testing equipment would now begin, and testing operations were expected to start in early October and be completed during that month.

DQE's 'Rig 40105' had been moved from Heron-1 to the Gazelle-1 well site, where it was in the process of being rigged up.

The spud of Gazelle-1 was forecast before the end of September.

Petro Matad said the start of testing operations on Heron-1 and drilling operations at Gazelle-1 would be announced in further updates to shareholders.

"While the results of the Red Deer-1 well are disappointing, it was the first well to be drilled in any of the basins located in the south of Block XX and it therefore carried a lower chance of success than the wells in the north," said Petro Matad executive chairman Mike Buck.

"The company's activities are now focussed on drilling and testing operations in the north of Block XX and we look forward to updating the market further on the spudding of Gazelle-1 and the testing on Heron-1."
More News
20 Sep 2018 12:57

UPDATE: Petro Matad Plunges As It Fails To Find Oil At Snow Leopard

LONDON (Alliance News) - Shares in Petro Matad Ltd fell on Thursday after the oil explorer said it did not find oil or gas accumulations at its Snow Leopard 1 Well, located in were trading down at

Read more
20 Sep 2018 10:59

Petro Matad Plunges As It Fails To Find Oil At Snow Leopard Well

LONDON (Alliance News) - Shares in Petro Matad Ltd fell on Thursday after the oil explorer said it did not find oil or gas accumulations at its Snow Leopard 1 Well, located in were trading down at

Read more
20 Sep 2018 10:30

WINNERS & LOSERS SUMMARY: Rio Tinto Up On Plan To Return Sale Proceeds

LONDON (Alliance News) - The following stocks are the leading risers and fallers within the main London indices on Thursday.----------FTSE 100 - WINNERS----------Rio up 1.9%.

Read more
7 Sep 2018 10:41

Petro Matad losses widen as it cashes up for planned operations

(Sharecast News) - Mongolian oil explorer Petro Matad released its unaudited interim results for the six months ended 30 June on Friday, reporting a loss of $6.65m, widening from $2.52m for the comparable period last year.

Read more
7 Sep 2018 10:15

Petro Matad Loss Widens, Contractor Issues Delay Block XX Drilling

LONDON (Alliance News) - Mongolia-focused oil explorer Petro Matad on Friday said its loss widened in the fist half of the year on a range of increased expenses.The company's USD6.7 was

Read more
24 Jul 2018 12:44

Petro Matad Non-Executive Director Oyungerel Janchiv Steps Down

LONDON (Alliance News) - Petro Matad Ltd on Tuesday said Non-Executive Director Oyungerel Janchiv intends to retire after the annual general meeting scheduled on September 20 to spend more time in

Read more
14 Jun 2018 11:32

Petro Matad Successfully Raises Cash To Fund Mongolian Drilling (ALLISS)

LONDON (Alliance News) - Mongolian oil explorer Petro Matad Ltd on Thursday said it has completed its previously announced share placing, which it said was "significantly" company had on

Read more
13 Jun 2018 17:16

Petro Matad To Raise Gross USD18.3 Million To Fund New Wells (ALLISS)

LONDON (Alliance News) - Petro Matad Ltd said Wednesday it aims to raise USD18.3 million through shares placing and a subscription.Net proceeds from the an accelerated bookbuild are to be a

Read more
4 Jun 2018 11:09

Petro Matad Loss Narrows Despite Delaying First Drilling Operation

LONDON (Alliance News) - Petro Matad Ltd said Monday its 2017 loss narrowed despite the company failing to complete its first drilling operation in six years.The Mongolian oil explorer loss

Read more
14 May 2018 11:59

Petro Matad Starts Mobilisation For Snow Leopard Drilling Amid Delays

LONDON (Alliance News) - Petro Matad Ltd said Monday it is close to securing permits for the Wild Horse 1 well, while the Snow Leopard 1 well spudding experienced delays.The Wild Horse 1 1

Read more
20 Mar 2018 17:29

Petro Matad drills into Mongolia - last frontier for onshore oil

* Same geology as prolific oil basins in China * Mongolia will need crude for planned refinery By Barbara March 20 (Reuters) - Petro Matad a

Read more
27 Jan 2017 16:10

Petro Matad issues drilling rig tender

(ShareCast News) - Petro Matad updated the market on Friday, announcing that it has issued a tender for a drilling rig and related services, in preparation for its drilling programme in Blocks IV and V, which is expected to commence in mid-2017. The AIM-traded firm said that in 2016, it pre-qualifie

Read more
18 Jan 2017 09:49

Petro Matad Expects Shell Payment Within Next 10 Days

Read more
12 Jan 2017 14:31

Petro Matad says nothing further to update on as stock jumps

(ShareCast News) - AIM-listed exploration company Petro Matad noted the jump in its share price on Thursday and confirmed there was nothing further to update the market on since its statement on Tuesday. Earlier in the week, Petro said the $5m payment due from Shell following the approval by the Mon

Read more
12 Jan 2017 14:08

Petro Matad Notes Share Price Move, Says No Further Update

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.