GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Share News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1175
Bid: 0.115
Ask: 0.12
Change: 0.00 (0.00%)
Spread: 0.005 (4.348%)
Open: 0.1175
High: 0.12
Low: 0.1175
Prev. Close: 0.1175
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

88 Energy shares plunge as Merlin-1 operational issues hinder sampling

Tue, 06th Apr 2021 10:34

(Alliance News) - 88 Energy Ltd's shares plunged on Tuesday, following the company's announcement that it will plug the Merlin-1 well in project Peregrine in the North Slope of Alaska, following testing issues.

AIM-listed shares in the Alaska-focused oil producer were 62% lower at 1.44 pence on Tuesday in London.

88 Energy had first started testing the well through a wireline program, in order to identify potential reservoir and resistivity in prospective hydrocarbon zones, as well as take samples for study.

Although initial observations indicated the presence of an oil signature in the fluid, a power outage caused by equipment failure led to a pull out from the hole for repairs. When re-entering the zone after repairs, 88 Energy found several sticky sections in the hole, indicating poor hole conditions.

After this, 88 Energy had decided to move to the next prospective zone considered to be the most shallow and that had shown good oil shows and petrophysical traits. However the tool used for testing became stuck due to wellbore condition issues.

Although the tool was freed, returning to the zone was considered too high a risk.

88 Energy said that although not being able to sample two zones considered to be the most prospective does not prevent a discovery, further analysis of sidewall cores and additional drilling may be required for confirmation.

One of the two zones was considered by 88 Energy to be a new prospective horizon within the Nanushuk formation, wholly within the Peregrine acreage, and the other zone has been interpreted to be shared with another zone in the Harrier prospect, north of Merlin.

Further work, including the integration of results from logging with the seismic, will be required to map for potential of these zones. However, it is too late in the season to start flow testing operations, and the forward program will feature the well being plugged.

88 Energy said the well could be re-entered in the future, to drill a sidetrack hole and conduct a flow test.

"Despite the operational issues that prevented obtaining a hydrocarbon sample from the two most prospective zones, the results from the Merlin-1 well are very encouraging for the potential at Project Peregrine. We appreciate that these early results may be difficult to interpret," said Managing Director David Wall.

"That is because we do not yet have all the data required to allow interpretation. This means some uncertainty remains; however, it is already clear that Merlin-1 has delivered by far the best outcome of any of the five wells drilled by 88 Energy in Alaska over the last six years," Wall added.

By Dayo Laniyan; dayolaniyan@alliancenews.com

Copyright 2021 Alliance News Limited. All Rights Reserved.

More News
8 Jun 2016 13:43

Positive progress for 88 Energy at Icewine

(ShareCast News) - Exploration company 88 Energy issued an extensive update on its operations at Project Icewine on Wednesday, including its securing of additional acreage. The AIM-traded firm said processing has been completed for the official award of 172,937 acres successfully bid on in the State

Read more
8 Jun 2016 09:34

88 Energy Says Progress Made On All Fronts For Alaskan Project Icewine

Read more
6 May 2016 07:50

88 Energy Completes 2D Seismic Acquisition At Alaskan Project Icewine

Read more
29 Apr 2016 13:50

CORRECT: 88 Energy Continues To Advance Design Of Second Icewine Well

Read more
29 Apr 2016 11:04

88 Energy Continues To Advance Design Of Second Icewine Well

Read more
22 Apr 2016 06:47

88 Energy Raises AUD25 Million In Oversubscribed Placing (ALLISS)

Read more
20 Apr 2016 16:08

88 Energy confirms plans for capital raising

(ShareCast News) - 88 Energy confirmed on Wednesday that it was looking to raise between AUS$10m (£5.3m) - $10M (£8m) cash through a placing of new shares at 3.5 cents each. Earlier in the day it had said trading in its Australian securities had been suspended, but that trading on AIM would continue

Read more
20 Apr 2016 14:30

UPDATE: 88 Energy Seeking To Obtain Subscriptions For Shares (ALLISS)

Read more
20 Apr 2016 08:01

88 Energy Shares Halted In Australia Ahead Of Planned Fundraising (ALLISS)

Read more
6 Apr 2016 15:38

88 Energy lifts estimates 293% at Icewine project

(ShareCast News) - AIM-traded 88 Energy reported a massive 293% increase in the recoverable resource estimates at Project Icewine on Wednesday, located at North Slope onshore Alaska. The AIM-traded company said its independent resource estimate for HRZ shale had been increased to 1.4bn barrels of oi

Read more
6 Apr 2016 08:59

88 Energy Says Icewine Shale Resource Estimate Increased

Read more
30 Mar 2016 09:22

88 Energy Says Permeability Of Icewine Samples Beats Expectations

Read more
17 Mar 2016 08:45

88 Energy To Test Production Potential With Second Icewine Well

Read more
2 Mar 2016 15:27

88 Energy Reports Narrower Loss Following Hefty Charges In 2014

Read more
29 Feb 2016 10:41

WINNERS & LOSERS SUMMARY: Mixed Fortunes For Morrisons And Ocado

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.