The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.
London South East prides itself on its community spirit, and in order to keep the chat section problem free, we ask all members to follow these simple rules. In these rules, we refer to ourselves as "we", "us", "our". The user of the website is referred to as "you" and "your".
By posting on our share chat boards you are agreeing to the following:
The IP address of all posts is recorded to aid in enforcing these conditions. As a user you agree to any information you have entered being stored in a database. You agree that we have the right to remove, edit, move or close any topic or board at any time should we see fit. You agree that we have the right to remove any post without notice. You agree that we have the right to suspend your account without notice.
Please note some users may not behave properly and may post content that is misleading, untrue or offensive.
It is not possible for us to fully monitor all content all of the time but where we have actually received notice of any content that is potentially misleading, untrue, offensive, unlawful, infringes third party rights or is potentially in breach of these terms and conditions, then we will review such content, decide whether to remove it from this website and act accordingly.
Premium Members are members that have a premium subscription with London South East. You can subscribe here.
London South East does not endorse such members, and posts should not be construed as advice and represent the opinions of the authors, not those of London South East Ltd, or its affiliates.
USA STANDARD LITHIUM & LAXNESS land holding map and the totally huge potential as production and supply start up ( now slightly late as this September was for initial start up ). Any day now ...
https://www.google.com/url?q=https://www.magnoliabannernews.com/news/2018/nov/15/standard-lithium-plans-joint-venture-smackover-pro/&sa=U&ved=2ahUKEwjIyoPZ0bfzAhVXPcAKHVj6DocQxfQBegQIAxAB&usg=AOvVaw2aBfb36hJn7sbjWRYbU0ou
STANDARD LITHIUM EU SUPPLY ?
Mintek says Standard Lithium will be looking to supply EUROPE aswell as the US - wow. The US needs 000's of tons of lce & Lithium Hydroxide too so even a mention of europe is an eye opener.
https://www.fool.com/investing/2021/09/23/why-standard-lithium-stock-is-jumping-today/
STANDARD LITHIUM - "20,900 mt of battery-quality lithium chemicals in Arkansas, representing roughly five times the current domestic production."
UP 58% through September 2021 and due to start production as the plant is due to switch on the FULL power within days....now slightly late so literally any day now !!! Good bounce to note yesterday as most stocks took a hit SLI had dropped in to the $8 dollars range. I watched it throughout the day and it bounced back well in to the mid $9 dollars in the day so looks like a new support level here around $8.50. My target with A- plant initial start up, B - Initial production and C - News on actual production figures and projections based on the plant flow rates and finally WHO is BUYING THE LITHIUM ???
Those are some very short term news events ready to take SLI to the next range of $13-15.00 imho.
NOT FINANCIAL ADVICE. PLEASE JUST DYOR. SLI is WAY ahead in the US with only Albamerle producing from one supply. Standard Lithium to ADD 5X current US Lithium supply. DYOR.
STANDARD LITHIUM PRODUCTION within days tyson.
Simple. $15-18 is my short term.
NEL HYDROGEN just get ready ;-))))) 24/7 factory opens within days too.
BOTH are 1st. 1st lithium production 5x the US current production 24/7. 1st hydrogen electrolyser plant to open on this scale 144 PER DAY and going to 25/7 PRODUCTION !!! Nothing like it in the world.
Got both as about 70% of all my holdings and as you know my prices are pretty low. Shows pick the best after doing good solid research and just wait through all the noise.
Hope you make more than a few quid.
STANDARD LITHIUM "A contingency of 25% was applied to direct costs (US$133 million) to yield an estimated all-in capital cost of US$870 million."
Great to know they have built in to the PEA a hefty US$133M as back up to the project. Peace of mind.
I think the real bonus here is the PEA uses a per ton figure of US$14,500. Current prices are around US$40,000 but will be upwards of US$15,000-18,000 per ton , so the PEA figures could well see a large amount of extra cash profit on the PEA sell on fee, thus any further land parcel purchases - options currently in place & overspends past the contingency of the extra US$133M would be paid off pretty quickly. Yet another bonus to the OPEX Cost of ONLY US$2,500 PER TON. WOW.
STANDARD LITHIUM "The operating cost estimate includes both direct costs and indirect costs, as well as allowances for mine closure. The majority of the operating cost comprises reagent usage required to extract the lithium from the brine, as well as conversion to lithium hydroxide monohydrate and electricity consumption. Out of this, the greatest amount is related to acid and base consumption (hydrochloric acid and ammonium hydroxide) and was estimated using information from the operating Demonstration Plant located in Union County, Arkansas. The all-in operating cost of $2,599 per tonne of lithium hydroxide is one of the lowest reported in the industry owing to two key factors which are location-specific. DLE processes are reagent intensive; in the case of the LiSTR process, the principal reagent cost is hydrochloric acid. A large portion (approximately 50%) of the acid required is produced on-site as a by-product of the electrochemical conversion of lithium chloride to lithium hydroxide. This can result in significant cost-savings during the lithium extraction step. "
The fact the cost savings come from one of the more distructive parts of processing the metal, does take away some of the discomfort I feel regarding the agents being used. These agents are globally used to more or less of a degree - god knows how much dirty chemical agents are used to make the bad low grade lithium mines across China viable ???
Standard Lithiums I would imagine again would come out high in the charts of the least poluting processing method along with the lower cost of the technical process which reduces the cost per ton.
Great to be honest !
Lithium $2,599 per tonne of lithium hydroxide is one of the lowest reported in the industry owing to two key factors which are location-specific.
A FANTASTIC low cost v all other brine , rock and certainly clay costs. Well done Standard Lithium.
STANDARD LITHIUM 49% larger than the 2019 resource estimate. This difference is directly related to unitization of the resource area. More specifically, the total aquifer volume has increased from 7.66 km3 in 2019 to 8.86 km3 (1.84 mi3 to 2.13 mi3) "
GREAT, nothing more needs to be said other than the options to expand on the Tetra land parcel and licence out the tech for royalties across Mid South USA .... winner winner.
Some brill data their MO.
All looks good.. and not just a short term play. This could be a very large company with multiple income streams and “mines”..
Fingers crossed.
Maybe have to wait forn20’dollars!! ;-)
Not sure what Tom make of the trading pattern but yet another up day and $12 close!
Hope mom it being greedy but want to wait til the “news” is out.
Need to find some MORE ££ for CUSN and E3!!
BTC Isn’t helping…waiting to sell some BTC stock
Pretty interesting trading today. "19k buy but a 10k sell and a minute by minute seller of £1,000 approx to the value of at least £16k. There are a number of buy trades equally £1,000 over several continual minutes.
Hope my preduction of news on actual production rates moves the sp towards the $13-15.00 a share target. Any good news and this is within reach.
Looking good.
Sorry tyson this is the E3 headline to their report on E3.
"Geological introduction to the lithium-brine potential at E3 Metals Corp. Clearwater and Exshaw properties, south-central Alberta; National Instrument 43-101 Technical Report prepared for E3 Metals Corp., Available at www.sedar.com, 62 p."
Tyson - the same company used by Standard , produced E3's PEA. Apex Geoscience know about lithoum brines and have experience so the SLI PEA should be pretty bang on. They usually understate to allow for "upgrade" news during PFS and then leaving some room for DFS promotion and sucking the last investors in through goid solid PR.
We are in early doors in both here and over there.
STANDARD LITHIUM "49% larger than the 2019 resource estimate. This difference is directly related to unitization of the resource area. More specifically, the total aquifer volume has increased from 7.66 km3 in 2019 to 8.86 km3 (1.84 mi3 to 2.13 mi3) "
GREAT, nothing more needs to be said other than the options to expand on the Tetra land parcel and licence out the tech for royalties across Mid South USA .... winner winner.
Lithium $2,599 per tonne of lithium hydroxide is one of the lowest reported in the industry owing to two key factors which are location-specific.
A FANTASTIC low cost v all other brine , rock and certainly clay costs. Well done Standard Lithium.
STANDARD LITHIUM "The operating cost estimate includes both direct costs and indirect costs, as well as allowances for mine closure. The majority of the operating cost comprises reagent usage required to extract the lithium from the brine, as well as conversion to lithium hydroxide monohydrate and electricity consumption. Out of this, the greatest amount is related to acid and base consumption (hydrochloric acid and ammonium hydroxide) and was estimated using information from the operating Demonstration Plant located in Union County, Arkansas. The all-in operating cost of $2,599 per tonne of lithium hydroxide is one of the lowest reported in the industry owing to two key factors which are location-specific. DLE processes are reagent intensive; in the case of the LiSTR process, the principal reagent cost is hydrochloric acid. A large portion (approximately 50%) of the acid required is produced on-site as a by-product of the electrochemical conversion of lithium chloride to lithium hydroxide. This can result in significant cost-savings during the lithium extraction step. "
The fact the cost savings come from one of the more distructive parts of processing the metal, does take away some of the discomfort I feel regarding the agents being used. These agents are globally used to more or less of a degree - god knows how much dirty chemical agents are used to make the bad low grade lithium mines across China viable ???
Standard Lithiums I would imagine again would come out high in the charts of the least poluting processing method along with the lower cost of the technical process which reduces the cost per ton.
Great to be honest !
STANDARD LITHIUM "A contingency of 25% was applied to direct costs (US$133 million) to yield an estimated all-in capital cost of US$870 million."
Great to know they have built in to the PEA a hefty US$133M as back up to the project. Peace of mind.
I think the real bonus here is the PEA uses a per ton figure of US$14,500. Current prices are around US$40,000 but will be upwards of US$15,000-18,000 per ton , so the PEA figures could well see a large amount of extra cash profit on the PEA sell on fee, thus any further land parcel purchases - options currently in place & overspends past the contingency of the extra US$133M would be paid off pretty quickly. Yet another bonus to the OPEX Cost of ONLY US$2,500 PER TON. WOW.
STANDARD LITHIUM "A contingency of 25% was applied to direct costs (US$133 million) to yield an estimated all-in capital cost of US$870 million."
Great to know they have built in to the PEA a hefty US$133M as back up to the project. Peace of mind.
LITHIUM PEA "The average brine supply well production rate is similar to the two existing bromine operations located immediately to the east of the Project. Brine from the supply wells would be conveyed to a lithium extraction and lithium hydroxide production facility by a network of underground fibreglass pipelines totalling approximately 18.3 km (11.4 miles) in length. The brine entering the production facility would be pre-treated to remove hydrogen sulphide gas (H2S), suspended solids and hydrocarbons, prior to processing by the Company’s proprietary direct lithium extraction process (LiSTR). After LiSTR processing, the lithium depleted brine is returned to the lower-grade North Resource area by a pipeline system 20.3 km (12.6 miles) in length to a network of 24 brine injection wells completed in the Smackover Formation. All extraction and reinjection would occur in the single unitized area to maintain reservoir pressures (as is the practice elsewhere in southern Arkansas).
Direct Lithium Extraction by LiSTR
The proprietary LiSTR lithium extraction process uses a fine-grained, solid, inorganic adsorbent to selectively adsorb lithium ions from the brine. The LiSTR process produces a concentrated lithium chloride solution. This process is currently being successfully tested by the Company at their Demonstration Plant in Union County, Arkansas (see December 03, 2020 news release). This Demonstration Plant has been successfully operating at a pre-commercial scale since May 2020.
Lithium Hydroxide Production
The concentrated lithium chloride solution from LiSTR is further concentrated by high pressure reverse osmosis and impurities are removed through ion exchange (as also successfully proven at the Company’s Demonstration Plant). The further concentrated and purified lithium chloride solution is processed by electrolysis to form a highly pure lithium hydroxide solution. This solution is crystalized into a solid, battery-quality lithium hydroxide monohydrate."
LITHIUM HYDROXIDE X2-3. The multiples of this first PEA on one project site looks great.
2 questions -
1 - The CEO indicated the role out of the 'MODULAR' technology , hinting at licencing out the tech ?
2 - The CEO quite clearly stated in September the closeness to the main ports on the Southern Coast of the US to supply lithium hydroxide to help with EUROPEAN requirements. Yes or No ? ;-)
Check out STELLANTIS Co for further reading.
STANDARD LITHIUM PEA "It should be noted that the Company has secured an option to acquire a key parcel of land in the contemplated Project area. This land may be suitable for siting a future brine processing and conversion facility as it is well served by existing infrastructure, utilities and pipeline easements. Development of the project, subject to continuing project definition, due diligence and receipt of future feasibility studies, contemplates production commencing in 2025 from the land package assembled by the Company to date"
So the extra land parcel in the Smackover Formation which Albamerle are currently producing millions of litres of bromine brine from , IS 100% LITHIUM enriched and ready to be processed. I mean in that SLI already know the brines are there in the new land they have options on which are NOT included here in this PEA.
You are looking at another 30,000-50,000tpa if Lithium Hydroxide from the optionable land. The story here is not simply one unit of land ( not one mine you are investing in ), but the potential of rapid MODULAR EXPANSION across the whole Arkansas Smackover Formation. This PEA only improves data on South & North "Tetra" project.
The real potential is multiples.
STANDARD LITHIUM PEA "The lithium extraction process is based on the Company’s proprietary LiSTR technology, and the final conversion to a lithium hydroxide product will use an electrochemical process tailored to lithium hydroxide production. The project is located in an area with significant existing infrastructure such as water, power, gas, road, rail and workforce; plus existing operating oil and gas assets, including wells, collection systems, easements and gas processing facilities."
LITHIUM US$2,599pt - WOW !!!!
One of THE lowest in the world on ANY lithium production.
The Initial Selling Pric US$/pt14.500 ...currently selling at +US$35-40,000pt so these figures although based in the last 2-3 years as an average could well see the project coming in at 100-200% higher margins - WOW.
LITHIUM "large-scale technology proof that we can hope to deploy it, in the future, on our other assets in the region. The attractive potential economics from this PEA support continued effort to de-risk and advance the SWA Project in parallel with the Company’s immediate focus, which is to deliver the first new lithium production facility in North America at the Lanxess facilities.”
STANDARD LITHIUM PEA update :-
Pre-tax US$2.83 Billion NPV at 8% discount rate and IRR of 40.5%;
After-tax US$1.97 Billion NPV at 8% discount rate and IRR of 32.1%;
20-year mine-life producing an average of 30,000 tonnes per year of battery-quality lithium hydroxide monohydrate (LHM);
Operating costs of US$2,599 per tonne of battery quality lithium hydroxide;
AACE Class 5 Total CAPEX estimate of US$870 Million including conservative 25% contingency of direct capital costs; and,
SW Arkansas Lithium Project PEA lithium brine resource is updated to consider the potential unitized area of production, leading to an increased total (global) in-situ resource of 1,195,000 tonnes Lithium Carbonate Equivalent (LCE) at the Inferred Category.