Less Ads, More Data, More Tools Register for FREE

Leighton Update

7 Sep 2009 07:23

RNS Number : 6097Y
Global Petroleum Ltd
07 September 2009
 



7 September 2009

RNS AIM release

DRILLING COMMENCES ON FOURTH PRODUCTION WELL - LEIGHTON OIL AND GAS FIELD

Texon Petroleum Ltd (ASX: TXNhas advised that the fourth Leighton well, Tyler Ranch #3, commenced drilling on 5 September 2009. The well has a planned total depth of 2,743 metres (9,000 feet) and will take about 12-15 days to reach its target, which is the same oil and gas reservoir as in the first three Leighton wells (Peeler #1, Tyler Ranch #1 and Tyler Ranch #2).

Tyler Ranch #3 is located 420 metres south of Tyler Ranch #1.

Global has a 15% working interest (11.25% net revenue interest) in the Leighton Project with joint venture parties Texon Petroleum Limited (70%) and Excellong, Inc (15%).

Testing of the recently drilled Tyler Ranch #2 is planned for Wednesday, 9 September 2009. If the test is successful, the well will be placed on production as soon as testing has been concluded - probably by mid September.

Enquiries:

Global Petroleum Limited

Shane Cranswick

Tel

+ 61 8 9322 6322

Email

global.info@globalpetroleum.com.au

Astaire Securities Plc (Nominated Adviser and Broker)

William Vandyk

Tel

+44 20 7448 4400

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQDLBBKKBLBBB

Related Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Back to RNS