Less Ads, More Data, More Tools Register for FREE

Leighton Update

30 Apr 2010 07:20

RNS Number : 1089L
Global Petroleum Ltd
30 April 2010
 



 

30 April 2010

RNS AIM release

SIXTH LEIGHTON WELL FLOWS OIL AND GAS 445 BOEPD

 

Texon Petroleum Ltd (ASX: TXN) has advised that that the sixth well on the Leighton Project, Tyler Ranch #5, has begun to flow oil and gas at the gross rate of 445 boepd from the Olmos reservoir (comprising 420 bopd and 150 mcf of gas per day) through a 8/64" choke.

 

The combined production rate of the five (5) existing Leighton wells (Peeler #1, Tyler Ranch #1, Tyler Ranch #2, Tyler Ranch #3 and Tyler Ranch # 4) at this time is a gross 460 boepd with Global's Working Interest share being 69 boepd.

 

Tyler Ranch #5 has been connected to oil tanks and a gas sales pipeline so that Global will now begin to obtain revenue from the production. The time from well spud to revenue earning production has been 22 days.

 

Global has a 15% working interest (11.25% net revenue interest) in the Leighton Project with joint venture parties Texon Petroleum Limited and Excellong, Inc.

 

 

 

Glossary:

bbl: barrel

boepd: barrels of oil equivalent per day (including gas converted to oil equiv barrels on basis of 6mcf to 1 barrel of oil equiv)

bopd: barrels of oil per day

mcf: thousand cubic feet

mmbtu: million British thermal units

psi: pounds per square inch

 

 

 

Enquiries:

 

Global Petroleum Limited

Shane Cranswick

Tel

+ 61 8 9322 6322

Email

global.info@globalpetroleum.com.au

Astaire Securities Plc (Nominated Adviser and Broker)

William Vandyk

Tel

+44 20 7448 4400

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQBLBXBZFFBBD

Related Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Back to RNS