If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZincox Resources Plc Regulatory News (ZOX)

  • There is currently no data for ZOX

New US Recycling Project

20 Feb 2007 07:02

ZincOx Resources PLC20 February 2007 New US Recycling project and expansion at Big River Zinc - 20 February 2007 ZincOx Resources plc (ZOX), is pleased to announce the completion ofpre-feasibility studies on an integrated zinc and iron recycling project whichwill include a new facility in Ohio and modifying and refurbishing the Big RiverZinc plant near St Louis. Using a zinc price of US$1,900 per tonne for the next five years and US$1,500thereafter the Ohio Project and Big River Zinc Project individually haveinternal rates of return of 20% and 35%, and have, net present values ofUS$60million and US$129million respectively (post tax, pre finance 10% discountrate). Commenting on the announcement, Andrew Woollett, ZincOx's Chairman said "Thesetwo projects, together with our new Turkish Project, complete the operatingstructure for our first fully integrated zinc, lead and iron recycling concept.This structure will enable us to recycle virtually all the valuable metals foundin electric arc furnace dust (EAFD), a problematic waste material produced whengalvanised steel is recycled. This structure and the proprietary technologyinvolved represents a blueprint that we intend to repeat elsewhere in theworld". At the Ohio Project a rotary hearth furnace will be used to treat EAFD torecover zinc and lead in an oxide concentrate (HZO) and to recover the containediron as a Direct Reduced Iron (DRI) product. The DRI will be melted in a smallelectric furnace that will produce a very clean slag suitable for constructionpurposes and pig iron which will be sold to the steel industry. The plant willbe designed to treat 200,000 tonnes per annum of EAFD for the production of48,000 tonnes of zinc contained in HZO and about 50,000 tonnes of pig iron. TheHZO will be sent to Big River Zinc for the recovery of the valuable metals. TheOhio plant will take approximately 18 months to construct at a capital cost ofabout US$107million. In June 2006, ZincOx acquired the Big River Zinc smelter, in Sauget, Illinois(BRZ). The HZO from both the Ohio Project and from the Aliaga project in Turkeywill be processed at BRZ. The zinc contained in the HZO will be dissolved inBRZ's refurbished leach plant. The resultant zinc bearing solution will bepurified in a new solvent extraction circuit, prior to conventional zincrecovery using BRZ's existing electrowinning, melting and casting equipment toproduce zinc ingots. The ZincOx management team used the solvent extractionprocess in the design of the flowsheet for the Skorpion zinc oxide deposit inNamibia, where it now accounts for 150,000 tonnes of zinc metal production perannum. Big River will be designed to produce 90,000 tonnes of Special High Gradequality zinc metal per annum. The refurbishment of the Big River plant andinstallation of solvent extraction will take approximately 16 months at a costof about US$90million. At Aliaga, in Turkey, (see announcement dated: 12 December 2006) ZincOx isplanning to develop an EAFD processing plant similar to that proposed for theOhio project. The capital cost of the Aliaga project is expected to beUS$106million with production commencing in mid 2008. The development of the plants in Turkey and Ohio and the refurbishment of theBig River Zinc facility are expected to require total capital expenditures ofabout US$303million, including contingencies. The company is investigatingvarious financing strategies including participation by one of ZincOx's largestshareholders, Teck Cominco. In December 2006, Teck Cominco, the world's secondlargest zinc mining company, increased its interest in ZincOx by 3.5% to 11.5%.Commenting on the financing, Andrew Woollett said "There are a number ofattractive financing options available to us, including the early sale of thefuture Shaimerden deferred payments, and we are optimistic that we will be ableto develop these projects without a major issue of new equity." For more information please contact: ZincOx Resources plcAndrew Woollett +44 (0) 1276 450100awoollett@zincox.comwww.zincox.com Conduit PRLeesa Peters/Laurence Read +44 (0) 20 7429 660leesa@conduitpr.com +44 (0) 781 2159885 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
27th Apr 20177:00 amRNSCancellation of admission to AIM
13th Apr 20173:04 pmRNSPosting of Annual Report & Notice of AGM
30th Mar 20177:00 amRNSFinal Results
25th Jan 20179:54 amRNSReceipt of Sale Proceeds and Loan Notes repayment
23rd Jan 201711:56 amRNSReplacement: Joint Venture Agreement
23rd Jan 20179:44 amRNSJoint Venture Agreement with Korea Zinc
12th Jan 20178:44 amRNSSale of Remaining Interest in KRP
24th Nov 20167:00 amRNSMemorandum of Understanding re Joint Venture
31st Oct 20167:30 amRNSSuspension - Zincox Resources plc
28th Sep 20167:00 amRNSHalf Yearly Report
1st Sep 20167:00 amRNSShare Dealing Arrangements
11th Jul 20167:00 amRNSDirectorate Change
4th Jul 201612:12 pmRNSHolding(s) in Company
30th Jun 20167:00 amRNSGrant of Options
30th Jun 20167:00 amRNSTotal Voting Rights
17th Jun 20161:13 pmRNSResult of AGM
17th Jun 20167:00 amRNSFundraising
19th May 20163:56 pmRNSPosting of Annual Report
12th May 20167:00 amRNSFinal Results for the year ended 31 December 2015
29th Apr 20167:00 amRNSCompletion of 90% transfer of Plant to Korea Zinc
17th Mar 20164:40 pmRNSSecond Price Monitoring Extn
17th Mar 20164:35 pmRNSPrice Monitoring Extension
10th Mar 20167:00 amRNSHolding(s) in Company
8th Mar 201610:30 amRNSHolding(s) in Company
4th Mar 20169:55 amRNSHolding(s) in Company
3rd Mar 201611:58 amRNSHolding(s) in Company
29th Feb 20167:00 amRNSTotal Voting Rights
8th Feb 201612:15 pmRNSHolding(s) in Company
2nd Feb 20167:00 amRNSFundraising
13th Jan 20167:00 amRNSBroker Change
29th Dec 20157:00 amRNSFundraising Unsuccessful
22nd Dec 201512:38 pmRNSShare Price Movement
18th Dec 201512:23 pmRNSResult of General Meeting
18th Dec 20157:00 amRNSGeneral Meeting Statement
2nd Dec 20152:09 pmRNSHolding(s) in Company
2nd Dec 201512:45 pmRNSPosting of the Circular to Shareholders
30th Nov 20157:00 amRNSKorean Debt Rescheduling
27th Nov 201510:28 amRNSHolding(s) in Company
25th Nov 20154:06 pmRNSProposed Fundraising for Working Capital
30th Sep 20157:00 amRNSHalf Yearly Report
28th Aug 20157:00 amRNSTotal Voting Rights
20th Aug 201512:16 pmRNSHolding(s) in Company
17th Aug 20151:19 pmRNSResult of General Meeting
14th Aug 20157:00 amRNSResult of Open Offer
31st Jul 20157:00 amRNSTotal Voting Rights
23rd Jul 20157:00 amRNSOpen Offer
17th Jul 20154:14 pmRNSHolding(s) in Company
16th Jul 20157:00 amRNSFundraising
14th Jul 20157:00 amRNSPerformance Improvement at Korean Recycling Plant
13th Jul 20157:00 amRNSLoan Notes Extension and Sale of USA Assets

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.