The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZanaga Iron Regulatory News (ZIOC)

Share Price Information for Zanaga Iron (ZIOC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.20
Bid: 7.10
Ask: 7.30
Change: -0.14 (-1.91%)
Spread: 0.20 (2.817%)
Open: 7.20
High: 7.20
Low: 7.20
Prev. Close: 7.34
ZIOC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Susbstantial Increase and Upgrade in Resource

4 Sep 2012 07:00

RNS Number : 4234L
Zanaga Iron Ore Company Ltd
04 September 2012
 



4 September 2012

  

 Substantial Increase and Upgrade in Zanaga Project Mineral Resource

Zanaga Iron Ore Company Limited ("ZIOC" or the "Company")(AIM:ZIOC) is pleased to announce a substantial increase and resource classification upgrade in the Zanaga Iron Ore Project (the "Zanaga Project") Mineral Resource, reported in accordance with the JORC Code, in the Republic of Congo (Congo Brazzaville).

Highlights

·; 57% increase in the overall Mineral Resource to 6.8 billion tonnes at an average grade of 32.0% Fe

·; 74% increase in Measured and Indicated resource category to 4.69 billion tonnes with an average grade of 32.5% Fe

·; Ratio of Measured, Indicated and Inferred Resources has improved to 35%:34%:31% respectively, a significant upgrade from the previous estimate announced on 26 October 2011 of 3%:59%:38%

·; Total of 176,109 metres drilled, drilling to an average of 145m included in revised 2012 JORC statement

·; Mineral Resource defined from only 25km of the 47km orebody identified

Clifford Elphick, Non-Executive Chairman of ZIOC, commented:

"The major increase in the resource announced today is exciting as it confirms the Zanaga Iron Ore Project has the potential to become a very significant iron ore producer with one of the largest iron ore resources in Africa. The systematic methodology applied to the large scale drilling programme continues to increase our understanding and confidence in the orebody, of which just over 50% has been drilled to date"

  

Revised Mineral Resource Statement

 

Classification

Tonnes (Mt)

Fe (%)

SiO2 (%)

Al2O3 (%)

P (%)

Mn (%)

LOI (%)

Measured

2,400

34.0

43.0

3.3

0.048

0.106

1.403

Indicated

2,290

30.8

46.6

3.0

0.052

0.116

0.701

Inferred

2,100

31

46

3

0.05

0.12

0.90

Total

6,800

32

45

3

0.05

0.11

1.01

Reported at a 0% Fe cut-off grade within an optimised Whittle shell representing a metal price of 130 USc/dmtu.

 

The Resource was estimated as a block model within constraining wireframes based upon logged geological boundaries. Tonnages and grades have been rounded to reflect appropriate confidence levels and for this reason may not sum to totals stated.

 

The Mineral Resource statement set out above is reported in accordance with the terms and definitions included in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004 edition) as at 29 August 2012. The information in this Report that relates to Mineral Resources is based on information compiled by Malcolm Titley, BSc MAusIMM MAIG, of CSA Global (UK) Ltd. Malcolm Titley takes overall responsibility for the Report as Competent Person. He is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM) and has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person in terms of the JORC Code. The Competent Person, Mr Malcolm Titley, has reviewed this Mineral Resource statement and given his permission for the publication of this information in the form and context within which it appears.

 

 

Drilling programme summary

 

Data used in the preparation of the Mineral Resource Estimate was sourced from all available information from diamond and RC drilling completed at the Zanaga Project, to a cut-off date of 15 July 2012. This includes an additional 49,125 metres (39% increase) of drilling carried out for the previous resource statement announced on 26 October 2011. A total 176,109 metres (1,213 holes) have been drilled to date, with 79,288 assays (XRF analyses and Niton analyses) used to model the mineral resource. Please see the table below for an update on drilling completed.

 

Drilling completed

Metres

At 26 Aug 2011 (previous resource estimate, announced 26 Oct 2011)

126,984

26 Aug 2011 - 15 July 2012 (cut-off for updated resource estimate, announced 4 Sept 2012)

49,125

Total to date

176,109

 

Geological Summary

 

The Zanaga Iron Ore deposit is located within a North-South oriented (metamorphic) Precambrian greenstone belt in the eastern part of the Chaillu Massif in South Western Congo. From airborne geophysical survey work, and morphologically, the mineralised trend constitutes a complex elongation in the North-South direction, of about 48 km length and 0.5 to 3 km width.

 

The ferruginous beds are part of a metamorphosed, volcano-sedimentary Itabirite/BIF and are inter-bedded with amphibolites and mafic schists. It exhibits faulted and sheared contacts with the crystalline basement. As a result of prolonged tropical weathering the BIF has developed a distinctive supergene iron enrichment profile.

 

At surface there is sometimes present a high grade (+60% Fe) canga of apparently limited thickness (

 

The base of the friable Itabirite zone appears to correlate with the moderately weathered/weakly weathered BIF boundary, and fresh BIF comprises bands of chert and magnetite/grunerite layers.

 

For further information please contact:

 

Zanaga UK Services Limited

Corporate Development and Andrew TraharInvestor Relations Manager +44 20 7399 1105

 

Liberum Capital Limited

Nominated Adviser, Financial Chris Bowman, Christopher BrittonAdviser and Joint Corporate Broker and Christopher Kololian

+44 20 3100 2000

 

Citigroup Global Markets Limited

Joint Corporate Broker Alex Carter

+44 20 7986 4000

 

Pelham Bell Pottinger

Financial PR James MacFarlane and Daniel Thole

+44 20 7861 3232

About us:

Zanaga Iron Ore Company Limited is listed on AIM, ticker: ZIOC and is the owner of 50% less one share interest in the Zanaga Iron Ore Project based in the Republic of Congo (Congo Brazzaville) through its joint venture partnership with Xstrata plc. The Zanaga Iron Ore Project is one of the largest iron ore deposits in Africa and has the potential to become a world-class iron ore producer.

 

 

Glossary

AL2O3

Alumina (Aluminium Oxide)

BIF

Banded Iron Formation is the fresh, hard, un-oxidised, banded, magnetite itabirite and consists of magnetite, silica and occasional amphibolite. At Zanaga the BIF has a total iron grade range of 10% Fe to 47% Fe, with an average 30% Fe.

Fe

Iron

Itabirite

metamorphosed BIF

JORC Code

the 2004 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves as published by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia

LOI

Loss on ignition

Magnetite

a magnetic greyish black iron mineral (Fe2O4)

Mineral Resource

a concentration or occurrence of material of intrinsic economic interest in or on the Earth's crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories

Mn

Manganese

P

Phosphorus

SiO2

Silica

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLIMATMBTMMTT
Date   Source Headline
30th Apr 20247:00 amRNSFeasibility Study Update
28th Mar 20244:06 pmRNSCorporate and Project Update
2nd Jan 20247:00 amRNSGlencore Loan Update
28th Dec 20237:00 amRNSMoU signed with CMEC and FS Process Update
19th Dec 20233:38 pmRNSResults of AGM
14th Dec 20237:00 amRNSCEO Appointment
14th Dec 20237:00 amRNSFunding Update - Subscription Facility
27th Nov 20235:00 pmRNSPosting of Annual Report and Notice of AGM
7th Nov 20237:00 amRNSInvestor Presentation
2nd Oct 20235:33 pmRNSIssue of Equity
29th Sep 20237:00 amRNSInterim Results
3rd Jul 20237:00 amRNSFunding update - subscription facility
3rd Jul 20237:00 amRNSAnnual Results
28th Feb 20234:35 pmRNSPrice Monitoring Extension
30th Jan 20234:40 pmRNSSecond Price Monitoring Extn
30th Jan 20234:35 pmRNSPrice Monitoring Extension
16th Dec 20224:37 pmRNSNotification of Major Holdings
16th Dec 202210:31 amRNSAcquisition, Admission & Board Appointments
13th Dec 202211:45 amRNSResults of General Meeting and Board Appointments
25th Nov 20224:36 pmRNSNotice of GM
25th Nov 20227:00 amRNSResults of AGM
23rd Nov 20227:00 amRNSAcquisition of 100% of Zanaga Iron Ore Project
4th Nov 20225:41 pmRNSNotice of Annual General Meeting
30th Sep 20221:00 pmRNSInterim Results
5th Sep 20224:40 pmRNSSecond Price Monitoring Extn
5th Sep 20224:35 pmRNSPrice Monitoring Extension
1st Jul 20227:00 amRNSAnnual Results
29th Apr 20224:40 pmRNSSecond Price Monitoring Extn
29th Apr 20224:35 pmRNSPrice Monitoring Extension
3rd Mar 20224:40 pmRNSSecond Price Monitoring Extn
3rd Mar 20224:36 pmRNSPrice Monitoring Extension
7th Jan 20224:41 pmRNSSecond Price Monitoring Extn
7th Jan 20224:35 pmRNSPrice Monitoring Extension
20th Dec 20213:13 pmRNSResult of AGM
8th Dec 20214:36 pmRNSPrice Monitoring Extension
25th Nov 20217:00 amRNSPosting of Annual Report and Notice of AGM
21st Oct 20214:40 pmRNSSecond Price Monitoring Extn
21st Oct 20214:36 pmRNSPrice Monitoring Extension
28th Sep 20217:00 amRNSINTERIM RESULTS
27th Sep 20214:41 pmRNSSecond Price Monitoring Extn
27th Sep 20214:35 pmRNSPrice Monitoring Extension
16th Sep 202112:11 pmRNSSecond Price Monitoring Extn
16th Sep 202112:10 pmRNSPrice Monitoring Extension
15th Sep 20214:41 pmRNSSecond Price Monitoring Extn
15th Sep 20214:36 pmRNSPrice Monitoring Extension
11th Aug 20214:40 pmRNSSecond Price Monitoring Extn
11th Aug 20214:35 pmRNSPrice Monitoring Extension
7th Jul 20214:40 pmRNSSecond Price Monitoring Extn
7th Jul 20214:35 pmRNSPrice Monitoring Extension
30th Jun 20217:00 amRNSAnnual Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.