REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Zenith completes ESP installation at well M-45

22 Aug 2017 07:00

RNS Number : 5957O
Zenith Energy Ltd
22 August 2017
 

August 22, 2017 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Zenith completes ESP installation at well M-45 in Azerbaijan

 

Zenith Energy Ltd. ("Zenith" or the "Company") (LSEZENTSX.VZEE), the dual listed international oil & gas production company operating the largest onshore oilfield in Azerbaijan, is pleased to announce that a latest generation Schlumberger electrical submersible pump (ESP) has successfully been installed in well M-45. Current production is 49 BOPD.

 

Zenith is confident that oil production at well M-45 could increase as technical adjustments are made and optimum production parameters are achieved.

 

The advanced technology of the ESP installed in well M-45 enables the Company's field personnel to monitor flow rates and temperature as well as to input reservoir pressure and electrical parameters to optimise production. It should be noted that this is the first ESP of this sophistication to be installed in the Company's field in Azerbaijan.

 

The Company has identified a further 11 wells with obsolete and unreliable existing ESP technology which are deemed capable of significant increases in production following the installation of the latest generation electrical submersible pumps. The new ESPs have been ordered from Schlumberger and Baker Hughes and designed in accordance with the specifications of each well.

 

Procuring the ESPs from two of the world's most renowned oilfield technology companies will enable Zenith's operational team to comparatively assess the respective advantages of both types of latest generation ESP, and will also mitigate the risk of possible delays in production and transportation.

 

Zenith's operational team expects the ESP replacement activities undertaken across the 11 wells will generate a total increase of 219 BOPD over existing production.

 

The Company is also evaluating other wells across the Company's 642.4 km2 field area where the installation of an ESP would significantly increase production.

 

 

  

Mike Palmer, Chief Operating Officer, Zenith Aran, the Company's Azerbaijan-based fully owned subsidiary, commented:

 

 

"The latest generation ESP technology allows Zenith's operational team to precisely control the downhole input pressure and optimise production. We no longer rely on determining fluid levels from the surface. We can determine the input pressure down to two decimal places and can control the speed of the pump to exactly hold the input pressure at our optimal rate.

 

We can also predict problems by monitoring the electrical input and temperature of the motor. All such parameters can be monitored remotely using any portable device, even a smartphone. All of our ESP installations will gradually be equipped with this technology."

 

 

 

For further information, please contact:

Zenith Energy Ltd.

Andrea Cattaneo

CEO & President

Email: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775 4474

 

Allenby Capital Limited (Joint Broker)

Nick Harriss

Nick Athanas

Richard Short

Telephone:   + 44 (0) 203 328 5656

 

Optiva Securities - (Joint Broker)

Christian Dennis

Telephone: + 44 (0) 203 137 1903

 

Abchurch (Financial PR/IR)

Tim Thompson

Telephone: +44 (0) 200 7398 7700

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEEEFFFWSEDA
Date   Source Headline
16th Nov 20177:00 amRNSFiling of 2017 Second Quarter Results
8th Nov 20177:00 amRNSExercise of Warrants
2nd Nov 20177:00 amRNSExercise of Warrants
1st Nov 20177:00 amRNSSigning of Commitment Letter for new drilling rig
23rd Oct 20177:00 amRNSExercise of Warrants
20th Oct 20177:00 amRNSZardab Field Operational Update
19th Oct 20177:00 amRNSExercise of Warrants and Appointment of Broker
16th Oct 20172:00 pmRNSDirector/PDMR Shareholding
16th Oct 20177:00 amRNSProduction increased from well C-21 in Azerbaijan
12th Oct 20177:00 amRNSExercise of Warrants
10th Oct 20177:00 amRNSNew perforations increase production from well C21
6th Oct 20177:00 amRNSSuccessful perforation of well C-21 in Azerbaijan
28th Sep 20177:00 amRNSIssue of CEO salary sacrifice shares
27th Sep 20177:00 amRNSInvestor Conference Call
27th Sep 20177:00 amRNSCEO Exercises Stock Options
19th Sep 201711:39 amRNSInvestor Conference Call and New Company Website
11th Sep 20177:00 amRNSZenith issues equity to fund workover rig purchase
7th Sep 20177:00 amRNSSuccessful perforation of well C-26 in Azerbaijan
6th Sep 20177:00 amRNSAzerbaijan Field Rehabilitation Operational Update
30th Aug 20177:00 amRNSDirector/PDMR Shareholding
22nd Aug 201711:43 amRNSDirector/PDMR Shareholding
22nd Aug 20177:00 amRNSZenith completes ESP installation at well M-45
21st Aug 20177:00 amRNSZenith purchases Chinese oilfield equipment
15th Aug 20177:00 amRNSFiling of 2017 First Quarter Results
11th Aug 20177:00 amRNSProduction increased at well M-66 in Azerbaijan
2nd Aug 201711:28 amRNSIssue of Equity
2nd Aug 20177:00 amRNSIssue of Equity
27th Jul 20177:00 amRNSProduction restored at well M-66 in Azerbaijan
24th Jul 20177:00 amRNSAppointment of Non-Executive Director
14th Jul 20177:00 amRNSZenith Issues Equity to Fund Field Development
7th Jul 201712:35 pmRNSDirector/PDMR Shareholding
7th Jul 201711:00 amRNSDirector/PDMR Shareholding
6th Jul 20172:39 pmRNSDirector/PDMR Shareholding
5th Jul 20173:36 pmRNSDirector/PDMR Shareholding
3rd Jul 20177:00 amRNSTeam B strikes success at well M-45
30th Jun 20176:18 pmRNSReserve Update and Exercise of Warrants
28th Jun 20175:03 pmRNSZenith Announces 2017 Annual Consolidated Results
23rd Jun 20177:00 amRNSOperational Update on Wells M-195 and M-45
8th Jun 20177:00 amRNSWorkover rig operated by Team B moves to well M-45
5th Jun 20177:40 amRNSSuccess of sidetrack at well M-195 in Azerbaijan
25th May 20177:00 amRNSIssue of Equity
18th May 20177:00 amRNSAppointment of COO and Grant of Stock Options
11th May 201712:19 pmRNSDirector/PDMR Shareholding
2nd May 20177:00 amRNSTotal Voting Rights
21st Apr 20177:00 amRNSAppointment of new CFO
18th Apr 201712:43 pmRNSDirector/PDMR Shareholding
18th Apr 20177:00 amRNSTeam A Commences Workover Operations
18th Apr 20177:00 amRNSTeam B Commences Sidetrack Operations at M-195
13th Apr 20173:45 pmRNSHolding(s) in Company
12th Apr 20177:00 amRNSOption Agreement and Update on CEO Salary Proposal

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.