Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 2.05
High: 2.05
Low: 2.05
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update on Wells M-195 and M-45

23 Jun 2017 07:00

RNS Number : 9576I
Zenith Energy Ltd
23 June 2017
 

 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Operational update on wells M-195 and M-45

 

 

Calgary, Alberta, June 23, 2017, Zenith Energy Ltd. ("Zenith" or the "Company") (LSE: ZEN; TSX.V: ZEE), the dual listed international oil & gas production company, is pleased to provide an update on operations at wells M-195 and M-45 in the Muradkhanli field.

 

Well M-195

Well M-195 has 8m of permeable hydrocarbon pay which has now been confirmed by a recently completed Pulsed Neutron Log and subsequent quantitative interpretation of this data by a third party log analysis company. This has further been supported by the historical pre-sidetrack production rates.

On June 5, 2017, the Company announced that initial flow rates of 149 barrels of fluid per day had been recorded at this well after the success of sidetrack operations. Following this announcement well flow had to be cut off in order to pull out the drill string. After this interruption the well did not resume flow because the wellbore could only be cleaned out to the top of the liner with the pulling unit due to liner internal diameter restrictions. It has become apparent that a coiled tubing unit is required to circulate the mud out of the open hole and remove the mud cake from the borehole walls.

It is worth noting that the mud weight used to drill the sidetrack had a specific gravity of 1.2 (10.0 ppg) and no losses were observed during the drilling. This would confirm that the reservoir pressure is at or near virgin reservoir pressure due to an active underlying aquifer.

 

The Company is pleased to announce that an internationally recognised Italian coiled tubing company, Smape Srl, has now been contracted to perform several well interventions in the Muradkhanli, Jafarli and Zardab fields, the first of which will be well M-195. A coiled tubing unit (CTU) operated by Smape is scheduled to arrive on June 24, 2017, to begin work and restore production at this well.

 

The arrival of the CTU will result in the creation of a third team, named 'Team C', which will operate this unit and complement the field rehabilitation activities of Teams A and B.

Team C is expected to play a particularly important role in the rehabilitation of wells in the Zardab field, many of which are plugged with sand from the reservoir. Three wells in particular, one of which will initially be chosen for a workover in 2017, produced in excess of 500 BOPD for a short time before they became plugged-up with sand.

The use of a CTU offers a number of advantages over a conventional workover rig. These include:

− Ability to use continuous tubing instead of jointed tubing.

− Capacity to circulate fluid and gas in the well whilst moving the tubing string up and down the well for cleaning, drilling, and stimulating wells.

− Removes the need to stop in order to make and break tubing connections, thereby significantly increasing the speed of operations; this is a particularly important advantage with wells in the Muradkhanli field which have a depth of over 3000m.

− Ability to workover wells that have high pressure and flow without killing the well. A workover rig would require the interruption of well flow prior to performing any well intervention work by introducing high-density fluid in the wellbore and risk damaging the well.

 

It should also be underlined that whilst a CTU is valued for the speed and operational flexibility it can offer; there are certain interventions which only a workover rig can perform such as running and pulling artificial lift equipment in a well.

Zenith's field management will therefore determine where best to use Team C's CTU and where to employ the workover rigs of Teams A and B.

The Company is also pleased to report that the design of the Schlumberger Electric Submersible Pump (ESP) scheduled for installation at well M-195 has now been completed. This is expected to optimise production and reserves recovery. A service contract between Zenith's subsidiary in Azerbaijan and Schlumberger is being finalised and delivery of the ESP is expected by mid-July 2017.

 

 

Well M-45

Zenith is pleased to announce that it has signed a framework contract with Baker Hughes Services International LLC, one of the world's largest oil & gas service companies, for the provision of fishing equipment. This equipment is significantly more modern and advanced than the fishing tools previously used onsite. This technology is expected to substantially increase the speed of operations at well M-45. Delivery of this equipment has taken place and the Company can confirm that fishing operations utilising these tools have already commenced.

The Company can also confirm that the more powerful workover rig operated by the external drilling company, given the name of 'Team B' and employed for the sidetrack of well M-195, is now fully operational at the well M-45 location.

 

Mike Palmer, Chief Operating Officer, Zenith Aran, commented:

"I am very excited about the progress we have made in the past month. Compared to the other rehabilitation projects I have worked on, we are ahead in almost every area and are certainly going in the right direction. We are bringing in specialists with whom I have worked before and who have a proven track record of operational success. Our plans for the remainder of 2017 are very exciting and I very much look forward to delivering some big results to showcase what Zenith is doing in Azerbaijan."

 

 

 

For further information, please contact:

 

Zenith Energy Ltd.

 

José Ramón López-Portillo

Chairman

 

Andrea Cattaneo

CEO & President

 

Email: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775-4474

 

Allenby Capital Limited (Joint Broker)

 

Nick Harriss

Nick Athanas

Richard Short

Telephone:   + 44 (0) 203 328 5656

 

Optiva Securities - (Joint Broker)

 

Christian Dennis

Telephone: + 44 (0) 203 137 1903

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDEAFKAASPXEAF
Date   Source Headline
15th Mar 20219:36 amRNSAcquisition of oil production asset in Tunisia
9th Mar 20215:28 pmRNSHolding(s) in Company
3rd Mar 202111:32 amRNSHolding(s) in Company
24th Feb 20217:00 amRNSCredit Line Agreement & Debt Settlement
10th Feb 202111:05 amRNSSecond Price Monitoring Extn
10th Feb 202111:00 amRNSPrice Monitoring Extension
10th Feb 20219:05 amRNSSecond Price Monitoring Extn
10th Feb 20219:00 amRNSPrice Monitoring Extension
10th Feb 20217:00 amRNSSuccessful completion of IPU in Congo
5th Feb 20212:06 pmRNSSecond Price Monitoring Extn
5th Feb 20212:01 pmRNSPrice Monitoring Extension
29th Jan 202112:24 pmRNSUpdate on Bond Coupon Payments
18th Jan 202111:29 amRNSResult of AGM & Granting of Stock Options
11th Jan 20217:15 amRNSCooperation Agreement for new acquisitions in MENA
11th Jan 20217:00 amRNSSale of Common Shares held in Treasury
6th Jan 20217:00 amRNSDebt Reduction & Exercise of Warrants
30th Dec 20202:06 pmRNSSecond Price Monitoring Extn
30th Dec 20202:01 pmRNSPrice Monitoring Extension
30th Dec 202011:06 amRNSSecond Price Monitoring Extn
30th Dec 202011:00 amRNSPrice Monitoring Extension
30th Dec 20207:15 amRNSGranting of Stock Options
29th Dec 20204:41 pmRNSSecond Price Monitoring Extn
29th Dec 20204:36 pmRNSPrice Monitoring Extension
29th Dec 20202:06 pmRNSSecond Price Monitoring Extn
29th Dec 20202:00 pmRNSPrice Monitoring Extension
29th Dec 202012:39 pmRNSPayment for oil production
29th Dec 202011:05 amRNSSecond Price Monitoring Extn
29th Dec 202011:00 amRNSPrice Monitoring Extension
29th Dec 20209:05 amRNSSecond Price Monitoring Extn
29th Dec 20209:00 amRNSPrice Monitoring Extension
23rd Dec 20204:40 pmRNSSecond Price Monitoring Extn
23rd Dec 20204:35 pmRNSPrice Monitoring Extension
23rd Dec 20209:06 amRNSSecond Price Monitoring Extn
23rd Dec 20209:00 amRNSPrice Monitoring Extension
23rd Dec 20207:00 amRNSSuccessful bid for Tilapia II
18th Dec 20205:04 pmRNSChange of Auditor & Notice of AGM
9th Dec 20209:05 amRNSSecond Price Monitoring Extn
9th Dec 20209:00 amRNSPrice Monitoring Extension
30th Nov 20206:31 pmRNSFiling of Half-Year Results
24th Nov 20207:00 amRNSOperational Update
11th Nov 20207:30 amRNSUpdate on legal claim against SMP
10th Nov 20207:40 amRNSTermination of LOI
10th Nov 20207:30 amRNSTermination of Exploration in Azerbaijan
2nd Nov 202010:27 amRNSCondensed audited annual financial results
29th Oct 20207:00 amRNSFiling of audited annual financial results
26th Oct 202012:00 pmRNSUpdate on publication of audited results
6th Oct 202010:33 amRNSRequest for a Suspension
30th Sep 20206:27 pmRNSPreliminary unaudited annual financial results
25th Sep 20205:30 pmRNSCompletion of Financing
18th Sep 20207:30 amRNSSubmission of Bid in 2020 Marginal Field Round

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.