Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZenith Energy Regulatory News (ZEN)

Share Price Information for Zenith Energy (ZEN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.05
Bid: 2.00
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.10 (5.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.05
ZEN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update on Wells M-195 and M-45

23 Jun 2017 07:00

RNS Number : 9576I
Zenith Energy Ltd
23 June 2017
 

 

ZENITH ENERGY LTD.

("Zenith" or the "Company")

Operational update on wells M-195 and M-45

 

 

Calgary, Alberta, June 23, 2017, Zenith Energy Ltd. ("Zenith" or the "Company") (LSE: ZEN; TSX.V: ZEE), the dual listed international oil & gas production company, is pleased to provide an update on operations at wells M-195 and M-45 in the Muradkhanli field.

 

Well M-195

Well M-195 has 8m of permeable hydrocarbon pay which has now been confirmed by a recently completed Pulsed Neutron Log and subsequent quantitative interpretation of this data by a third party log analysis company. This has further been supported by the historical pre-sidetrack production rates.

On June 5, 2017, the Company announced that initial flow rates of 149 barrels of fluid per day had been recorded at this well after the success of sidetrack operations. Following this announcement well flow had to be cut off in order to pull out the drill string. After this interruption the well did not resume flow because the wellbore could only be cleaned out to the top of the liner with the pulling unit due to liner internal diameter restrictions. It has become apparent that a coiled tubing unit is required to circulate the mud out of the open hole and remove the mud cake from the borehole walls.

It is worth noting that the mud weight used to drill the sidetrack had a specific gravity of 1.2 (10.0 ppg) and no losses were observed during the drilling. This would confirm that the reservoir pressure is at or near virgin reservoir pressure due to an active underlying aquifer.

 

The Company is pleased to announce that an internationally recognised Italian coiled tubing company, Smape Srl, has now been contracted to perform several well interventions in the Muradkhanli, Jafarli and Zardab fields, the first of which will be well M-195. A coiled tubing unit (CTU) operated by Smape is scheduled to arrive on June 24, 2017, to begin work and restore production at this well.

 

The arrival of the CTU will result in the creation of a third team, named 'Team C', which will operate this unit and complement the field rehabilitation activities of Teams A and B.

Team C is expected to play a particularly important role in the rehabilitation of wells in the Zardab field, many of which are plugged with sand from the reservoir. Three wells in particular, one of which will initially be chosen for a workover in 2017, produced in excess of 500 BOPD for a short time before they became plugged-up with sand.

The use of a CTU offers a number of advantages over a conventional workover rig. These include:

− Ability to use continuous tubing instead of jointed tubing.

− Capacity to circulate fluid and gas in the well whilst moving the tubing string up and down the well for cleaning, drilling, and stimulating wells.

− Removes the need to stop in order to make and break tubing connections, thereby significantly increasing the speed of operations; this is a particularly important advantage with wells in the Muradkhanli field which have a depth of over 3000m.

− Ability to workover wells that have high pressure and flow without killing the well. A workover rig would require the interruption of well flow prior to performing any well intervention work by introducing high-density fluid in the wellbore and risk damaging the well.

 

It should also be underlined that whilst a CTU is valued for the speed and operational flexibility it can offer; there are certain interventions which only a workover rig can perform such as running and pulling artificial lift equipment in a well.

Zenith's field management will therefore determine where best to use Team C's CTU and where to employ the workover rigs of Teams A and B.

The Company is also pleased to report that the design of the Schlumberger Electric Submersible Pump (ESP) scheduled for installation at well M-195 has now been completed. This is expected to optimise production and reserves recovery. A service contract between Zenith's subsidiary in Azerbaijan and Schlumberger is being finalised and delivery of the ESP is expected by mid-July 2017.

 

 

Well M-45

Zenith is pleased to announce that it has signed a framework contract with Baker Hughes Services International LLC, one of the world's largest oil & gas service companies, for the provision of fishing equipment. This equipment is significantly more modern and advanced than the fishing tools previously used onsite. This technology is expected to substantially increase the speed of operations at well M-45. Delivery of this equipment has taken place and the Company can confirm that fishing operations utilising these tools have already commenced.

The Company can also confirm that the more powerful workover rig operated by the external drilling company, given the name of 'Team B' and employed for the sidetrack of well M-195, is now fully operational at the well M-45 location.

 

Mike Palmer, Chief Operating Officer, Zenith Aran, commented:

"I am very excited about the progress we have made in the past month. Compared to the other rehabilitation projects I have worked on, we are ahead in almost every area and are certainly going in the right direction. We are bringing in specialists with whom I have worked before and who have a proven track record of operational success. Our plans for the remainder of 2017 are very exciting and I very much look forward to delivering some big results to showcase what Zenith is doing in Azerbaijan."

 

 

 

For further information, please contact:

 

Zenith Energy Ltd.

 

José Ramón López-Portillo

Chairman

 

Andrea Cattaneo

CEO & President

 

Email: info@zenithenergy.ca

Telephone: +1 (587) 315 9031

Telefax: +1 (403) 775-4474

 

Allenby Capital Limited (Joint Broker)

 

Nick Harriss

Nick Athanas

Richard Short

Telephone:   + 44 (0) 203 328 5656

 

Optiva Securities - (Joint Broker)

 

Christian Dennis

Telephone: + 44 (0) 203 137 1903

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDEAFKAASPXEAF
Date   Source Headline
1st Dec 20217:00 amRNSPublication of Half-Year Results
29th Nov 20214:36 pmRNSPrice Monitoring Extension
29th Nov 20217:00 amRNSOption Agreement for OML 141 RSC in Nigeria
22nd Nov 20212:05 pmRNSSecond Price Monitoring Extn
22nd Nov 20212:00 pmRNSPrice Monitoring Extension
22nd Nov 20217:00 amRNSAcquisition of SLK from CNPC
12th Nov 202112:00 pmRNSPublication of UK 2021 Prospectus
8th Nov 20217:00 amRNSUpdate on profitability of Italian operations
2nd Nov 202112:26 pmRNSCredit Rating Upgrade
2nd Nov 20217:00 amRNSCompletion of subscription for new shares
29th Oct 20217:00 amRNSSignificant production uplift from ROB-1
25th Oct 20217:00 amRNSSuccessful workover of ROB-1, onshore Tunisia
12th Oct 20217:00 amRNSWorkover of ROB-1, onshore Tunisia
5th Oct 20217:00 amRNSNew record electricity production revenue
16th Sep 20217:00 amRNSRecord electricity production revenue in Italy
14th Sep 20212:20 pmRNSCredit Rating Upgrade
9th Sep 20217:00 amRNSGranting of Stock Options
31st Aug 20217:00 amRNSExclusivity agreement for OML 141 RSC in Nigeria
31st Aug 20217:00 amRNSFiling of 2021 FY annual audited results
23rd Aug 202111:53 amRNSPayment of multi-currency bond coupon
20th Aug 20217:00 amRNSReceipt of payment from SNPC subsidiary in Congo
19th Aug 20217:15 amRNSMobilisation of rig to Robbana concession, Tunisia
9th Aug 202112:08 pmRNSInitiation of Analyst Coverage by Allenby Capital
30th Jul 202111:35 amRNSDirector/PDMR Shareholding
29th Jul 20217:00 amRNSDebt reduction
23rd Jul 202111:38 amRNSDonation of medical equipment in Tunisia
22nd Jul 202110:33 amRNS2021 Competent Person’s Report
12th Jul 20217:00 amRNSUpdate on Prospectus
8th Jul 20217:00 amRNSSale of Tunisian oil production
25th Jun 20217:00 amRNSExtension of KUFPEC acquisition & coupon payments
10th Jun 20217:00 amRNSDrilling activities in Robbana, onshore Tunisia
1st Jun 20217:00 amRNSDebt Reduction & Issue of Warrants
26th May 20217:00 amRNSLoan for Tunisian Development
18th May 20217:00 amRNSAppointment of Country Manager & Prospectus
13th May 20217:00 amRNSGranting of Stock Options
12th May 20217:00 amRNSCompletion of EPT acquisition
11th May 20217:00 amRNSCorrection: Norwegian institutional investment
10th May 20211:19 pmRNSNorwegian institutional investment in Zenith
30th Apr 202111:32 amRNSExercise of Warrants
30th Apr 20217:00 amRNSAcquisition of Robbana and El Bibane in Tunisia
23rd Apr 20217:00 amRNSDebt reduction, amendment of terms and warrants
21st Apr 20211:42 pmRNSHolding(s) in Company
21st Apr 20217:00 amRNSOffer to acquire oil production assets in Tunisia
8th Apr 20217:00 amRNSExtension of SPA for SLK acquisition from KUFPEC
29th Mar 20216:00 pmRNSHolding(s) in Company
25th Mar 202112:05 pmRNSDirector/PDMR Shareholding
24th Mar 202112:32 pmRNSCompletion of Ezzaouia acquisition
22nd Mar 20217:00 amRNSPrivate Placement in Norway
19th Mar 20217:00 amRNSExercise of Warrants
17th Mar 20217:00 amRNSExtension of SPA for acquisition of SLK from CNPC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.