Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.00
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.20 (22.222%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 1.00
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bushranger results of metallurgical test work

15 Aug 2022 13:05

RNS Number : 0570W
Xtract Resources plc
15 August 2022
 

 

 

For immediate release

15 August 2022

 

Xtract Resources Plc

("Xtract" or the "Company")

Bushranger Project - Results of Scoping Metallurgical Test Work Programme

 

The Board of Xtract Resources Plc ("Xtract" or the "Company") is pleased to report the results of a scoping metallurgical test work programme carried out on four samples from the Racecourse and Ascot deposits at Bushranger.

 

Highlights

 

· Altrius Consulting ('ACPL') developed and managed a scoping metallurgical test work programme to assess the metallurgical response of the copper-gold mineralisation from the Bushranger Project on behalf of the Company

· Four master composite samples of quartered drill core were prepared, based upon a geographic location within the Racecourse and Ascot deposits, namely Racecourse Central, Racecourse North-West, Racecourse South-East and Ascot

· The samples were representative of the anticipated average copper grade of the deposit, ranging from 0.33-0.48% Cu, with minor silver (1.1g/t to 3.3g/t) and trace gold (0.007g/t to 0.04g/t), other than the more gold-rich Ascot sample which assayed 0.30g/t Au

· The test work completed to date has yielded encouraging copper recovery results generally running at 89-90%, other than for the Racecourse North-West sample (76% recovery) where further work is recommended to better understand the different metallurgical response from this area

· Initial test work was focussed on copper recovery not gold, however, the Ascot sample also yielded payable gold and silver in the Cu concentrate

· At Racecourse, sampled intervals were not from areas where gold grade was relatively high, however it was considered that due to the metallurgical performance observed in these areas, that payable gold would probably be achieved with additional optimisation of the recovery circuit and/or in areas where gold grade was slightly higher. Further sampling and test work needs to be completed to confirm this hypothesis

· All concentrates produced payable silver grades. Further work was also recommended targeted at recovering molybdenum

· Test work indicates that the concentrates produced contained no significant penalty elements, with these concentrates considered "clean" and therefore should be readily saleable

 

Colin Bird, Executive Chairman said: "The results of the test work are considered typical of metal recoveries for deposits on the Lachlan Fold Belt. The Ascot overall gold grade has yet to be determined, so metallurgical work here is still at an early stage. The new report will be used to update the Bushranger concept study and was necessary to further advance the Racecourse project. We are pleased to note that there are no significant penalty elements and concentrate is regarded as clean and saleable.

No test work has been directed specifically at molybdenum recovery. Some nearby mines on the Lachlan Fold Belt are recovering molybdenum and, in one case a new circuit has been installed specifically for recovery of the metal. At Bushranger, molybdenum recovery will be disregarded for the concept study for now but could make a contribution to a future mining operation." 

 

Test Work Details

Samples for the Bushranger Project sighter metallurgical test work programme were selected and sampled (¼ core) from the remaining drill core from the Phase II drilling campaign, conducted within the Racecourse and Ascot deposits. The samples were selected (

Table 1), such that four master composite samples were formed, based upon a geographic location within the deposits and representative of the anticipated average copper resource grades, as detailed below:

 

Table 1 - Core Sample Selection Summary

Drill Collar

Composite

From

To

Assay

Weight

(m)

(m)

Cu (%)

Au (g/t)

Ag (g/t)

(kg)

BRDD_21_008

Central

206

274

0.48

0.040

3.3

93.4

BRDD_21_011

North-West

308

370

0.34

0.020

1.1

65.5

BRDD_21_013

South-East

142

208

0.33

0.007

1.6

65.4

BRDD_21_035

Ascot

552

616

0.38

0.30

2.3

66.1

 

The weighted mean assay results for the sampled intervals indicate the presence of predominantly copper (0.33% to 0.48%) with minor silver (1.1g/t to 3.3g/t) and trace gold (0.007g/t to 0.04g/t), with the exception of the Ascot sample which returned a gold grade of 0.30g/t. A sequential copper analysis on the Bushranger samples concluded that for all the samples tested, the predominant copper mineral is chalcopyrite.

 

Key components of the sighter metallurgical test work programme included: 

· Comprehensive head analysis of each master composite sample

· Comminution test work to assess ore hardness (Bond Ball Mill Work Index)

· Sequential copper speciation to provide an indication of copper mineralogy

· Rougher flotation test work at a pre-determined primary grind size, to assess rougher copper recovery

· Rougher flotation test work at two different reagent suites, aiming to maximise rougher copper recovery

· Bulk rougher flotation to generate concentrate for cleaner flotation test work, with and without concentrate regrind

· Mineralogical evaluation of flotation tails - diagnostic assessment to assess nature and occurrence of gold losses

Ore hardness assessments, utilising Bond Ball Mill Work Index testing, concluded that the samples are of an extreme hardness with an average work index of 23.35 kWh/t. Abrasion index testing classifies the ore as moderately abrasive, with an average abrasiveness of 0.2985.

 

Table 2 - Cleaner Flotation Regrind Test Work Summary

Sample

Cumulative Conc. Grade

Recovery (%)

Tails Grade

Mass Yield

(%)

Au (g/t)

Ag (g/t)

Cu (%)

As (ppm)

Au

Ag

Cu

Au (g/t)

Ag (g/t)

As (ppm)

Cu (%)

BR_Centre

0.9

181.6

23.3

210

23

85

89

0.02

0.3

8

0.03

2%

BR_NW

0.6

58.1

20.4

409

37

54

78

0.01

0.6

10

0.05

1%

BR_SE

0.3

81.1

18.8

155

19

50

87

0.02

1.2

10

0.02

2%

BR_Ascot*

5.4

152.3

27.3

93

41

42

82

0.07

1.7

6

0.03

1%

Average

1.8

118.3

22.5

217

30

58

84

0.03

1.0

9

0.03

1%

*Ascot requires no regrind

The regrind-cleaner flotation test work (coarse flotation followed by regrind of coarse rougher concentrate and selective flotation or cleaning) indicated that the average final copper concentrate grades would vary between 19% copper and 27% copper, with a corresponding final copper recovery of between 78% and 89%. 

When normalising the cleaner flotation results to produce a concentrate with a 20% copper grade, typical for saleable concentrates, the following copper recovery is predicted:

Ascot - 90% (no regrind, three stages cleaner flotation)

BR_Centre - 90% (15µm regrind, three stage cleaner flotation)

BR_SE - 89% (15µm regrind, pH 10.5, three stage cleaner flotation)

BR_NW - 76% (15µm regrind, pH 10.5, three stage cleaner flotation)

Silver recovery to copper concentrates averaged 58%

These results are considered encouraging, with further study required on the Racecourse North-West sample to understand the reason for the lower copper recovery in this sample.

Regarding gold recovery, this initial test work was focussed on copper not gold. No optimisation work was included to increase gold recovery at this stage. However, the Ascot sample yielded payable gold in the Cu concentrate. At Racecourse, even though these samples were not selected from relatively high gold grade areas, it was considered that payable gold would probably be achieved with additional optimisation of the recovery circuit and/or in areas where gold grade was slightly higher. However, further sampling and test work needs to be completed to confirm this hypothesis.

 

Similarly with molybdenum, the content of the cleaner was generally low, however further investigation is considered warranted in subsequent test programmes given that molybdenum recovery was not specifically targeted.

 

 

 

Further information is available from the Company's website which details the company's project portfolio as well as a copy of this announcement: www.xtractresources.com

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

 

The person who arranged for the release of this announcement on behalf of the Company was Colin Bird, Director.

 

Enquiries:

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Jon Belliss

Colin Rowbury 

 

+44 (0)207 399 9427

www.novumsecurities.com

 

 

 

Qualified Person:

Information in this announcement relating to the exploration works has been reviewed by Edward (Ed) Slowey, BSc, PGeo, a consultant to Xtract. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved the geological content of this announcement.

 

Marius Phillips, Engineering Director of Altrius Consulting, is a Chartered Professional Engineer with over 25 years' experience. Mr Phillips has developed a strong operational, managerial and technical base in minerals processing and the extractive metallurgy of base metals, precious metals and PGMs. Mr Phillips has reviewed and approved this announcement as a Qualified Person.

 

Qualified Person:

In accordance with AIM Note for Mining and Oil & Gas Companies, June 2009 ("Guidance Note"), Colin Bird, CC.ENG, FIMMM, South African and UK Certified Mine Manager and Director of Xtract Resources plc, with more than 40 years' experience mainly in hard rock mining, is the qualified person as defined in the Guidance Note of the London Stock Exchange, who has reviewed the technical information contained in this press release.

 

 

TECHNICAL GLOSSARY

 

The following is a summary of technical terms:

 

 

"Chalcopyrite"

A copper-iron sulphide mineral, CuFeS2, often found in copper ores

"Comminution"

Grinding of the rock

"Flotation"

The separation of small particles of a solid by their different capacities to float

 

"kWh/t"

Kilowatt hours per tonne

"Mineralisation"

Process of formation and concentration of elements and their chemical compounds within a mass or body of rock

 

"Molybdenum"

Ore mineral, MoS2

"Rougher flotation"

Flotation designed to remove the maximum amount of the valuable mineral at as coarse a particle size as practical

 

 

 

 

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFELFFLVLEBBZ
Date   Source Headline
8th Oct 20203:35 pmRNSManica Hard Rock Project Update
7th Oct 202010:10 amRNSComment regarding Zambia media reports
30th Sep 20205:30 pmRNSFunding facility
30th Sep 20208:41 amRNSHalf-year Report
30th Sep 20207:05 amRNSIssue of Equity
8th Sep 20209:35 amRNSPitting programme results at Eureka project
2nd Sep 20201:35 pmRNSChange of auditor
25th Aug 20207:00 amRNSAdditional Manica Gold Hard Rock Mining Agreement
19th Aug 202011:32 amRNSManica Gold Hard Rock Mining Contractor Agreement
13th Aug 202011:20 amRNSBushranger Copper / Gold Progress Update
12th Aug 20209:05 amRNSManica Alluvial Gold & Corporate Update
23rd Jul 202010:20 amRNSDirectorate Change
3rd Jul 20204:00 pmRNSAward of share options
30th Jun 20204:32 pmRNSResult of AGM
11th Jun 202011:00 amRNSEureka 3-D geological modelling
8th Jun 20207:00 amRNSFinal Results and Notice of Annual General Meeting
1st Jun 202012:30 pmRNSBushranger copper / gold project Australia
27th May 20207:00 amRNSManica Alluvial Gold & Corporate Update
26th May 20202:05 pmRNSSecond Price Monitoring Extn
26th May 20202:00 pmRNSPrice Monitoring Extension
18th May 20204:41 pmRNSSecond Price Monitoring Extn
18th May 20204:36 pmRNSPrice Monitoring Extension
12th May 202011:05 amRNSSecond Price Monitoring Extn
12th May 202011:00 amRNSPrice Monitoring Extension
11th May 202012:16 pmRNSHolding(s) in Company
11th May 202012:15 pmRNSHolding(s) in Company
31st Mar 20201:10 pmRNSEureka & Kajevu drilling programme results
4th Mar 20204:30 pmRNSManica Alluvial Gold & Corporate Update
23rd Jan 202011:00 amRNSDrilling update on Eureka & Kajevu, Zambia
20th Dec 20191:00 pmRNSIssue of Equity
12th Dec 20191:30 pmRNSAlluvial collaboration agreement update
28th Nov 201910:31 amRNSDirector/PDMR Shareholding
27th Nov 201910:30 amRNSDirector/PDMR Shareholding
26th Nov 20199:56 amRNSDirector/PDMR Shareholding
19th Nov 20192:00 pmRNSZambia Copper Exploration Update
12th Nov 201911:00 amRNSManica Alluvial Gold & Corporate Update
21st Oct 20193:21 pmRNSKalengwa update
14th Oct 201911:51 amRNSDirector/PDMR Shareholding
27th Sep 20193:28 pmRNSHalf-year Report
5th Sep 201910:11 amRNSHolding(s) in Company
4th Sep 20192:24 pmRNSManica Hard Rock Project Progress Update
3rd Sep 20194:42 pmRNSHolding(s) in Company
2nd Sep 201910:05 amRNSTotal Voting Rights
20th Aug 201912:42 pmRNSTailings sampling at Kalengwa
9th Aug 20197:00 amRNSEureka Project Update
2nd Aug 20193:29 pmRNSDirector/PDMR Shareholding
1st Aug 201912:58 pmRNSCompany and Manica Alluvial Gold Update
25th Jul 20194:03 pmRNSIssue of Equity
22nd Jul 20192:05 pmRNSSecond Price Monitoring Extn
22nd Jul 20192:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.