PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.00
Bid: 0.90
Ask: 1.10
Change: 0.00 (0.00%)
Spread: 0.20 (22.222%)
Open: 1.00
High: 1.00
Low: 1.00
Prev. Close: 1.00
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bushranger Project - Further Drill Assay Results

26 May 2021 07:00

RNS Number : 7985Z
Xtract Resources plc
26 May 2021
 

 

For immediate release

26 May 2021

 

Xtract Resources Plc

("Xtract" or the "Company")

Further Drill Assay Results from the Bushranger Copper-Gold Project

 

The Board of Xtract Resources Plc ("Xtract" or the "Company") is pleased to advise that laboratory assays have been received from the second and third drill holes (BRDD-21-002 & BRDD-21-003) completed on the Phase One diamond drilling programme at the Racecourse Mineral Resource on the Bushranger copper-gold exploration project, located in the Lachlan Fold Belt ("LFB") of New South Wales, Australia.

 

 

Highlights

 

· Assay results for the second and third angled holes of the Phase 1 exploration drilling at the Racecourse porphyry deposit confirm visual observation of extensive intervals of copper mineralisation in both holes

· Assay intervals include (see full interval details in Table 1 below):

BRDD-21-002

o 362m @ 0.20% CuEq from 422m

§ including 14m @ 0.36% CuEq from 500m

§ and 26m @ 0.32% CuEq from 638m

BRDD-21-003

o 200m @ 0.20% CuEq from 598m

§ including 68m @ 0.26% CuEq from 676m

§ and 16m @ 0.31% CuEq from 714m

· Results from these two holes, along with results from the first hole of the programme and historic drilling results indicate that, as the Racecourse copper mineralisation extends northwest beyond the existing Inferred Mineral Resource, it increases significantly in width, however the higher-grade mineralisation occurs at shallower depths, enhancing the open pit potential of the deposit

· As announced on 17 May 2021, the Company has engaged external mining consultants to build a financial model to investigate the economics of open pit extraction of the shallower ore

· Assay results from the remaining two holes of the Phase 1 programme are awaited

· The planned Phase 2 drilling programme at Racecourse is on track for commencement early in Quarter 3, 2021 which will focus on further definition of the shallower higher-grade zone and testing of the deposit extensions to the south and east as suggested by the recent IP geophysics survey

Table 1 - Assay Results from Drill Hole BRDD-21-002 & BRDD-21-003*

Hole No.

From (m)

To (m)

Interval (m)

Cu (%)

Au (g/t)

Ag (g/t)

CuEq (%)**

BRDD-21-002

442

804

362

0.19

0.01

0.9

0.20

incl.

468

520

52

0.25

0.01

1.7

0.27

incl.

500

514

14

0.33

0.01

2.3

0.36

and

638

664

26

0.30

0.02

1.0

0.32

and

776

794

18

0.28

0.01

1.1

0.30

incl.

784

794

10

0.31

0.02

1.2

0.33

 

 

 

 

 

 

 

 

BRDD-21-003

598

798

200

0.18

0.01

1.2

0.20

incl.

626

744

118

0.21

0.01

1.2

0.23

incl.

676

744

68

0.24

0.02

1.3

0.26

incl.

714

730

16

0.28

0.02

1.6

0.31

*Assays undertaken by Bureau Veritas Minerals Pty. Ltd. Laboratory, Adelaide, Australia

**CuEq Formula: CuEq = Cu% + 0.62xAu (g/t) + 0.0093xAg (g/t)

 

 

Colin Bird, Executive Chairman said: "The assay results from the first three holes of the Phase One drilling programme at the Racecourse Prospect have succeeded in extending the copper mineralisation 350-450m to the northwest of the current limit of the Mineral Resource and a significant distance down dip. In comparison to previous drilling on the project by Anglo American, our recent intersections are substantially wider, suggesting that as the Racecourse mineralisation extends to the northwest it is growing significantly in thickness. The higher-grade sections appear to occur at shallower depths and form a "cap" of higher-grade mineralisation over the top of the central porphyry intrusion. We believe this enhances the ability to potentially open pit mine the Racecourse copper mineralisation. Consequently, we have engaged external mining consultants to build a financial model of what an open pit mining operation could look like at Racecourse. Also, as the drilling results received to date have met our programme objective to demonstrate the extension to the northwest of the Racecourse mineral deposit, we have committed to a Phase 2 drilling programme, to commence early in Quarter 3, to drill out the Mineral Resource and test a number of exploration targets which have been identified from the recently competed IP survey (see RNS released 17 May 2021). The Racecourse prospect is entering an exciting new phase and our objective is to define an internationally significant mineral resource."

 

Phase One Drilling Programme at the Racecourse Mineral Resource - Bushranger Project

The Phase One drilling programme at the Racecourse Mineral Resource was designed to follow up on the strong results obtained by Anglo American Exploration Australia Pty Ltd in 2014 and 2015 (refer to RNS released on 01 June 2020). The objective of the programme was to explore the extent of the copper-gold mineralised porphyry system to the northwest and at depth, beyond the limits of previous drilling, thereby testing the potential extensions to the northwest of the Racecourse Mineral Resource.  At 71Mt @ 0.44% Cu and 0.064g/t Au, at a 0.3% Cu cut-off, the existing Racecourse Inferred Mineral Resource is believed to be one of the largest undeveloped porphyry copper-gold deposits in the Lachlan Fold Belt of New South Wales, Australia.

Following the success of the first hole of the programme, BRDD-20-001, which substantially extended the known limits of the deposit down-plunge to the north-west, subsequent holes in the Phase 1 programme were drilled obliquely across the deposit to test the width and grade of the mineralisation within the deposit extension. All completed holes intersected wider mineralised zones than anticipated in the form of disseminated and fracture-fill chalcopyrite, accompanied by pyrrhotite and pyrite, as confirmed by assays received for holes BRDD-21-002 and BRDD-21-003. While assay results from the two remaining holes of the programme are awaited, it is already apparent from the drilling results to date that there is significant scope to expand the current Inferred Mineral Resource at Racecourse. The new results, combined with historic drilling, point towards a higher-grade mineralised 'cap' to the deposit over the top of the central porphyry intrusion. Arising from the ongoing appraisal of the results, an independent firm has been engaged to undertake technical and financial modelling for an initial open pit mine, examining several pit layout scenarios and economic parameters.

 

The Phase 2 drilling programme at Racecourse, planned to commence early in Quarter 3, 2021 will focus on additional definition of the shallower higher-grade cap and testing of further deposit extensions to the south and east as suggested by the recent IP geophysics survey.

 

Assay results from the remaining two holes of the Phase 1 drilling programme will be reported when they are received and collated.

 

Please see the following web links for the Racecourse Mineral Resource drill hole location plan, cross section and long section:

 

Bushranger Project Drill Hole Location Plan

 

http://www.rns-pdf.londonstockexchange.com/rns/7985Z_1-2021-5-25.pdf

 

Racecourse Mineral Resource Long Section

 

http://www.rns-pdf.londonstockexchange.com/rns/7985Z_2-2021-5-25.pdf

 

Racecourse Mineral Resource Cross Section

 

http://www.rns-pdf.londonstockexchange.com/rns/7985Z_3-2021-5-25.pdf

 

 

Further information is available from the Company's website which details the company's project portfolio as well as a copy of this announcement: www.xtractresources.com

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

 

The person who arranged for the release of this announcement on behalf of the Company was Colin Bird, Director.

 

 

Enquiries:

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Jon Belliss

Colin Rowbury

 

+44 (0)207 399 9427

www.novumsecurities.com  

 

 

Qualified Person:

Information in this announcement relating to the exploration works has been reviewed by Edward (Ed) Slowey, BSc, PGeo, a consultant to Xtract. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved the geological content of this announcement.

 

Qualified Person:

In accordance with AIM Note for Mining and Oil & Gas Companies, June 2009 ("Guidance Note"), Colin Bird, CC.ENG, FIMMM, South African and UK Certified Mine Manager and Director of Xtract Resources plc, with more than 40 years' experience mainly in hard rock mining, is the qualified person as defined in the Guidance Note of the London Stock Exchange, who has reviewed the technical information contained in this press release.

 

 

TECHNICAL GLOSSARY

The following is a summary of technical terms:

 

"Ag"

Silver

"Au"

Gold

"chalcopyrite"

a copper-iron sulphide mineral, CuFeS2, often found in copper ores

"Cu"

Copper

"CuEq"

copper equivalent grade, calculated using assumed metal prices for copper, gold and other metals

"Inferred Mineral Resource"

That part of a Mineral Resource for which quantity and grade (or quality) are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade (or quality) continuity. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes

"JORC Code"

Australasian Institute of Mining and Metallurgy Joint Ore Reserves Committee code on mineral resources and ore reserves

"mineralisation"

process of formation and concentration of elements and their chemical compounds within a mass or body of rock

"porphyry"

a deposit of disseminated copper minerals in or around a large body of intrusive rock

"pyrite"

Iron sulphide mineral, FeS2

"pyrrhotite"

an iron sulphide mineral, Fe1-XS, often magnetic

 

 

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEAXSSASXFEFA
Date   Source Headline
27th Jul 201610:06 amRNSAdmission of Shares
20th Jul 20167:00 amRNSManica and Chepica Update and Placing
4th Jul 201611:13 amRNSResult of AGM
30th Jun 20167:00 amRNSAGM Update
16th Jun 201612:30 pmRNSShareholder Presentation - 16 June
15th Jun 20162:00 pmRNSHolding(s) in Company
8th Jun 201612:00 pmRNSHolding(s) in Company
7th Jun 20167:22 amRNSFinal Results
7th Jun 20167:00 amRNSShareholder presentation - 16 June 2016
26th May 20167:00 amRNSDisposal of Manica Gold Project for US$17.5m
23rd May 201612:21 pmRNSXtract will NOT present at Shares Investor Evening
19th May 20167:00 amRNSXtract to present at Shares Investor Evening
11th May 20167:00 amRNSManica Gold Resource increased 36% to 1.257Moz
10th May 20168:11 amRNSDrawdown of US$2.4m in Debt
4th May 20169:04 amRNSQ1 Operational update
26th Apr 201612:13 pmRNSOperations Update Notice and UK Investor Show
13th Apr 20167:00 amRNSChepica Earn-in Option
15th Mar 20164:24 pmRNSHolding(s) in Company
14th Mar 20163:53 pmRNSHolding(s) in Company
8th Mar 201612:47 pmRNSCorrection on Manica cash costs & webcast playback
7th Mar 20167:00 amRNSUpdate on Manica Gold Project
1st Mar 20167:00 amRNSMozambique Government approve Manica acquisition
4th Feb 20167:46 amRNSProcessing plant restart at Chepica Mine
3rd Feb 201611:20 amRNSQ4 Operational Update
27th Jan 201611:52 amRNSChepica Update and Q4 Production Presentation
21st Jan 20167:00 amRNSOperations Update
13th Jan 20167:00 amRNSChepica Gold Mine - Update
29th Dec 20157:00 amRNSChepica Gold Mine - Fatal Accidents
30th Nov 20157:00 amRNSChepica Gold Mine - Operational Update
12th Nov 20157:00 amRNSOption Extensions
30th Oct 20151:56 pmRNSHolding(s) in Company Replacement
30th Oct 20159:52 amRNSHolding(s) in Company
20th Oct 201512:55 pmRNSInvestor presentation
20th Oct 20157:15 amRNSJV on new alluvial gold production at Manica
20th Oct 20157:00 amRNSChepica Q3 Operational Update
15th Oct 20157:31 amRNSAuroch Shareholders approve sale of Manica
13th Oct 20157:00 amRNSQ3 Production Update Presentation in London
8th Oct 20157:00 amRNSAssay results from Copper Tailings Project
29th Sep 20157:01 amRNSHalf Yearly Report
22nd Sep 20157:00 amRNSCarolusberg & O'Kiep Drilling Programme Completed
10th Sep 20157:00 amRNSManica Acquisition - Revised Terms Agreed
4th Aug 20157:00 amRNSHigh Grade Gold Reef system discovered at Chepica
22nd Jul 20151:28 pmRNSDirector/PDMR Shareholding
22nd Jul 201512:42 pmRNSDirector/PDMR Shareholding
15th Jul 201510:36 amRNSNew high grade reef system discovered at Chepica
8th Jul 20159:50 amRNSHolding(s) in Company
7th Jul 20159:38 amRNSImproved recoveries from test work at Fair Bride
29th Jun 20156:16 pmRNSResult of AGM
29th Jun 20157:00 amRNS£4.4m Placing and Acquisition agreement signed
25th Jun 20159:35 amRNSChepica Mine - Delivering on key milestones

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.