The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.00
Bid: 0.90
Ask: 1.10
Change: 0.00 (0.00%)
Spread: 0.20 (22.222%)
Open: 1.00
High: 1.00
Low: 1.00
Prev. Close: 1.00
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bushranger Pre-Concentration Test Results

20 Jul 2023 09:05

RNS Number : 6536G
Xtract Resources plc
20 July 2023
 

 

For immediate release

20 July 2023

 

Xtract Resources Plc

("Xtract" or the "Company")

Bushranger Pre-Concentration Test Results

 

The Board of Xtract Resources Plc ("Xtract" or the "Company") is pleased to announce the results from a study to determine the applicability of the "TOMRA" method to pre-concentrate copper-gold mineralisation from the Racecourse Mineral Resource on the Bushranger Copper-Gold Project ("Project") in central New South Wales, Australia. 

 

Highlights

 

· Completion of initial metallurgical test work with pre-concentration ore sorting of Racecourse samples using "TOMRA" ore sorting technology involving X-Ray Transmission and machine learning to sort mineralisation into a pre-concentrated ore product and waste.

 

· All samples processed with TOMRA achieved upgrades to the copper content of the pre-concentrated material, with results in recovery varying depending on the quantity of sulphide in each sample.

 

· A higher-grade sample assaying 0.56% Cu upgraded well with TOMRA treatment however with low metal recovery due to higher metals content in waste fractions, suggesting that pre-concentration may not be beneficial for higher-grade ore.

 

· Excluding the higher-grade sample, the average input grade of typical grade copper-gold mineralisation was 0.23% Cu, which was upgraded to 0.35% Cu, giving a grade uplift of 52%. 

 

· The average mass yield was 36%, indicating that 64% of the original mass of the samples was rejected into the waste product, suggesting that ore sorting has the ability to increase the ore grade whilst reducing the mass to be treated.

 

· Pre-concentration results for gold also showed a grade uplift using the TOMRA system, however the results are of limited significance to the overall project.

 

· TOMRA recommended additional testing on different sample material, particularly higher-grade material to gauge amenability to ore sorting.

 

· Xtract has engaged Optimal Mining Solutions (Pty) Ltd of Australia ("Optimal Mining") to incorporate the most recent TOMRA results into an updated economic model for the overall Bushranger Project. 

 

Colin Bird, Executive Chairman said: "We are pleased with the results from the TOMRA pre-concentration study which demonstrate that we could achieve significant upgrades to copper mineralisation in the pre-concentrated product, while rejecting a lot of the initial material into waste. The higher-grade sample did not benefit from ore sorting suggesting that the first 4 to 5 years of open pit development when grades are significantly higher than the Project average grade may not require pre-concentration.

The continuing economic study by independent consultants Optimal Mining will model the impact of TOMRA pre-concentration on the overall economics of the Project, while we also consider other pre-concentration routes for Bushranger ore and we look forward to releasing an updated economic model for the Bushranger Project."

 

Bushranger Project TOMRA Pre-Concentration Study

Following conclusion of the Phase 2 drilling programme on the Bushranger Copper-Gold Project in central New South Wales, Australia, and the finalisation of the upgraded Mineral Resource for the Racecourse Prospect, Xtract undertook pre-concentration test work on five composite samples from four drill holes. Pre-concentration of mineralisation reduces the amount of material needed to be milled and placed through a flotation processing plan, which in turn can reduce pre-production capital and operating costs, with subsequent improvements in the overall economic performance of a project.

Xtract engaged TOMRA Sorting Solutions ("TOMRA") of Sydney, Australia, to undertake the pre-concentration test work on the five samples. Data was collecting using TOMRA's COM X-Ray Transmission ("XRT") system. The COM XRT system detects mineralised particles and then sorts the material into a pre-concentrated product and waste using amplified mechanical, hydraulic or pneumatic processes. The sorter is set up / trained using images taken of the samples. The images are then analysed using proprietary TOMRA image processing software. Based upon the images sorting task specific algorithms are then developed and applied to sorting the mineralised material.

The Racecourse Prospect samples were submitted for TOMRA pre-concentration test work as detailed in Table 1.

Table 1 - Bushranger Prospect Drill Samples Submitted for TOMRA Analysis

 

Run

Drill Hole

From (m)

To (m)

Interval (m)

Cu%

1

BRDD_21_036

61.00

89.00

28.00

0.20

2

BRDD_21_010

180.00

198.00

18.00

0.24

3

BRDD_21_022

290.00

308.00

18.00

0.25

4

BRDD_21_021_B

227.00

243.00

16.00

0.56

5

BRDD_21_021_A

173.00

187.00

14.00

0.21

 

For the training of the XRT sorter, samples were exposed to high energy X-rays, which project an image onto a sensor. The X-ray sensor signal depends on atomic density and material thickness and gives information on the inner composition of the particles. By combining two energy levels simultaneously, it is possible to differentiate particles by their atomic densities and then separate material into a pre-concentrated product and waste.

 

The results of the TOMRA pre-concentration are given in Table 2.

 

 

 

 

 

 

 

 

Table 2 - Bushranger Prospect Drill Samples Results of TOMRA Analysis

 

Run Number

1

2

3

4

5

Avg.

Avg. (excl. high grade run 4)

Cu Grade of Original Sample (Cu%)

0.20

0.24

0.25

0.56

0.21

0.29

0.23

Back Calc. Original Grade (Cu%)*

0.15

0.26

0.32

0.52

0.20

0.29

0.23

Product Grade (Cu%) following Pre-Conc.

0.35

0.35

0.41

0.94

0.30

0.47

0.35

Waste Grade (Cu%)

0.067

0.20

0.23

0.50

0.16

0.23

0.16

 

Original Mass (Kg)

22.5

32.7

10.5

13.7

11.9

18.3

19.4

Pre-Conc. Product Mass (Kg)

7.1

12.2

5.1

0.7

3.3

5.68

6.9

Waste Mass (Kg)

15.4

20.5

5.4

13

8.6

12.6

12.5

 

Original Contained Cu (kg)

3.4

8.5

3.4

7.1

2.4

5.0

4.4

Pre-Conc. Product Contained Cu (kg)

2.4

4.2

2.1

0.66

1.0

2.1

2.4

Mass Yield (%)

31.6

37.3

48.6

5.1

27.7

30.0

36.3

Metal Recovery (%)

72.6

49.6

62.1

9.3

32

45.1

54

*Back calculation of initial Cu grade from final product for mass balance purposes

Table 2 details the masses and Cu assays for the pre-concentrated materials produced from this set of test work, as well as the back-calculated initial sample copper grades. The back-calculated copper grades are slightly different to the original copper grades as detailed in Table 1, due to the natural variability of the copper mineralisation.

 

The primary sorting task was to produce a high-grade product fraction by way of sulphide classification and ejection in a single stage for each sample. All runs conducted for this set of test work were "Dual-Energy" XRT runs. This form of processing is designed to classify and eject relatively high-density sulphides away from the relatively low-density host-rock. All samples were screened to a 20-40mm particle size with the exception of Run 1 (BRDD21_010_Comp) which was run at 25-75mm.

 

All five samples processed with TOMRA achieved upgrades to the copper and gold content of the pre-concentrated ore, while rejecting significant volumes of waste material, with one higher grade sample (Run 4) being an outlier. Excluding the outlier, the average original grade of the four samples of copper-gold mineralisation was 0.23% Cu, while the average grade of the pre-concentrated mineralisation was 0.35% Cu, which shows a grade uplift of 52%. The average mass yield was 36%, meaning that 64% of the original mass of the sample was rejected into the waste product, suggesting that it will be possible to greatly reduce the volume of material needed to be processed through the milling and floatation circuits of a processing plant.

 

The TOMRA pre-concentration results do exhibit a significant amount of variability depending on the quantity of sulphides in the original composite drill core samples. The outlier was Run 4, which had the highest original feed grade material (0.52% Cu), achieved the highest sorted product grade (0.94% Cu), but in a very low mass (mass yield of 5.1%). This suggests that higher-grade material may not benefit from ore sorting to the same extent as the more typical deposit grades and would be more suited to direct processing.

The results overall show the potential of the TOMRA system to significantly increase the copper grade into a pre-concentrated product while rejecting potentially over 50% of the original rock mass into waste. The variability of the results indicate that more samples would need to be tested in order to determine an accurate average overall effect for TOMRA pre-concentration. 

 

The pre-concentration results are sufficiently positive for the effects of TOMRA pre-concentration to be incorporated into the overall financial model for the Bushranger Project. Consequently, Xtract has engaged Optimal Mining Solutions (Pty) Ltd of Australia ("Optimal Mining") to incorporate the TOMRA results into an updated economic model for the overall Bushranger Project.

 

 

Further information is available from the Company's website which details the company's project portfolio as well as a copy of this announcement: www.xtractresources.com

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

 

The person who arranged for the release of this announcement on behalf of the Company was Colin Bird, Executive Chairman and Director.

 

Enquiries:

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Jon Belliss

Colin Rowbury 

 

+44 (0)207 399 9427

www.novumsecurities.com  

 

 

 

Qualified Person

In accordance with AIM Note for Mining and Oil & Gas Companies, June 2009 ("Guidance Note"), Colin Bird, CC.ENG, FIMMM, South African and UK Certified Mine Manager and Director of Xtract Resources plc, with more than 40 years' experience mainly in hard rock mining, is the qualified person as defined in the Guidance Note of the London Stock Exchange, who has reviewed the technical information contained in this press release.

 

 

 

TECHNICAL GLOSSARY

The following is a summary of technical terms:

 

"Cu"

Copper

"mineralisation"

Process of formation and concentration of elements and their chemical compounds within a mass or body of rock

 

 

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCURVBRORUBURR
Date   Source Headline
27th Jul 201610:06 amRNSAdmission of Shares
20th Jul 20167:00 amRNSManica and Chepica Update and Placing
4th Jul 201611:13 amRNSResult of AGM
30th Jun 20167:00 amRNSAGM Update
16th Jun 201612:30 pmRNSShareholder Presentation - 16 June
15th Jun 20162:00 pmRNSHolding(s) in Company
8th Jun 201612:00 pmRNSHolding(s) in Company
7th Jun 20167:22 amRNSFinal Results
7th Jun 20167:00 amRNSShareholder presentation - 16 June 2016
26th May 20167:00 amRNSDisposal of Manica Gold Project for US$17.5m
23rd May 201612:21 pmRNSXtract will NOT present at Shares Investor Evening
19th May 20167:00 amRNSXtract to present at Shares Investor Evening
11th May 20167:00 amRNSManica Gold Resource increased 36% to 1.257Moz
10th May 20168:11 amRNSDrawdown of US$2.4m in Debt
4th May 20169:04 amRNSQ1 Operational update
26th Apr 201612:13 pmRNSOperations Update Notice and UK Investor Show
13th Apr 20167:00 amRNSChepica Earn-in Option
15th Mar 20164:24 pmRNSHolding(s) in Company
14th Mar 20163:53 pmRNSHolding(s) in Company
8th Mar 201612:47 pmRNSCorrection on Manica cash costs & webcast playback
7th Mar 20167:00 amRNSUpdate on Manica Gold Project
1st Mar 20167:00 amRNSMozambique Government approve Manica acquisition
4th Feb 20167:46 amRNSProcessing plant restart at Chepica Mine
3rd Feb 201611:20 amRNSQ4 Operational Update
27th Jan 201611:52 amRNSChepica Update and Q4 Production Presentation
21st Jan 20167:00 amRNSOperations Update
13th Jan 20167:00 amRNSChepica Gold Mine - Update
29th Dec 20157:00 amRNSChepica Gold Mine - Fatal Accidents
30th Nov 20157:00 amRNSChepica Gold Mine - Operational Update
12th Nov 20157:00 amRNSOption Extensions
30th Oct 20151:56 pmRNSHolding(s) in Company Replacement
30th Oct 20159:52 amRNSHolding(s) in Company
20th Oct 201512:55 pmRNSInvestor presentation
20th Oct 20157:15 amRNSJV on new alluvial gold production at Manica
20th Oct 20157:00 amRNSChepica Q3 Operational Update
15th Oct 20157:31 amRNSAuroch Shareholders approve sale of Manica
13th Oct 20157:00 amRNSQ3 Production Update Presentation in London
8th Oct 20157:00 amRNSAssay results from Copper Tailings Project
29th Sep 20157:01 amRNSHalf Yearly Report
22nd Sep 20157:00 amRNSCarolusberg & O'Kiep Drilling Programme Completed
10th Sep 20157:00 amRNSManica Acquisition - Revised Terms Agreed
4th Aug 20157:00 amRNSHigh Grade Gold Reef system discovered at Chepica
22nd Jul 20151:28 pmRNSDirector/PDMR Shareholding
22nd Jul 201512:42 pmRNSDirector/PDMR Shareholding
15th Jul 201510:36 amRNSNew high grade reef system discovered at Chepica
8th Jul 20159:50 amRNSHolding(s) in Company
7th Jul 20159:38 amRNSImproved recoveries from test work at Fair Bride
29th Jun 20156:16 pmRNSResult of AGM
29th Jun 20157:00 amRNS£4.4m Placing and Acquisition agreement signed
25th Jun 20159:35 amRNSChepica Mine - Delivering on key milestones

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.