PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

High Grade Assay Results Continue at La Parrilla

20 Aug 2012 07:00

RNS Number : 3012K
W Resources PLC
20 August 2012
 



 

 

 

 

 

 

 

20 August 2012

 

 

W Resources Plc

("W" or the "Company")

 

 

High Grade Assay Results Continue at La Parrilla Tungsten Project

 

Significant intersections include 32 metres at 0.55% WO3

 

 

W Resources (AIM:WRES), formerly Caspian Holdings plc, is pleased to provide the latest update on drilling at its La Parrilla tungsten project, located in southwest Spain, in which it has an option to purchase a 100% interest.

 

The Company has received assay results for core holes 3 and 4 in the La Parrilla extension drilling programme, in which results from hole 4 were exceptional including 32 metres at 0.55% Tungsten Trioxide (WO3), five-times the average grade of the current La Parrilla resource. Hole 4 was drilled to a depth of 382.50m, 470m northwest of the main ore body and continues the series of strong results from the extension drilling programme.

 

Hole 3 assays were also positive with a combined 40 metres at an average of 0.2% WO3over 106 m to 170m - twice the current resource grade.

 

W has now completed six holes on its extension drilling programme with assays received on holes 1-4.

 

The full weighted averaged results of hole 4 and hole 3 are shown in the table below:

 

DRILL HOLE IP-04 (VERTICAL) 382.50 m LONG

FROM

TO

INT

TRUE THICKNESS

WO3 %

Sn %

20.00

26.00

6.00

3.86

0.0095

0.0057

40.00

72.00

32.00

20.57

0.5518

0.0061

190.00

254.00

64.00

41.13

0.0049

0.004

268.00

298.00

30.00

19.28

0.0016

0.0017

 

 

DRILL HOLE IP-03 (VERTICAL) 372.85 m LONG

FROM

TO

INT

TRUE THICKNESS

WO3 %

Sn %

74.00

86.00

12.00

8.49

0.0514

0.0087

106.00

128.00

22.00

15.56

0.1951

0.0068

152.00

170.00

18.00

12.73

0.2009

0.0174

202.00

250.00

48.00

33.94

0.071

0.0078

308.00

316.00

8.00

5.66

0.1255

0.0064

 

The weighted average grades have been calculated for intersections through

mineralised envelopes defined by quartz veining and no cut off grade has been used.

 

Mr Michael Masterman, Chairman of W Resources commented: "Given the success of the extension programme, W expects to complete another 4-6 holes in a grid pattern around holes 1-6 with the objective of defining a significant increase in both the grade and the tonnage of the La Parrilla mine resource."

  

In other developments, approval of the La Parrilla tailings project continues with key environmental approval documents now in place. As previously advised, the Company expects approval of the tailings in Q3 2012.

 

A detailed map of the La Parrilla site including the four drill hole locations can be found on the Company's website at http://www.wresources.co.uk/projects/la-parrilla/

 

Enquiries:

W Resources Plc

Grant Thornton Corporate Finance - Nomad

Michael Masterman

Gerry Beaney / Melanie Frean / Jen Clarke

T: +44 (0) 20 7193 7463

T: +44 (0) 20 7383 5100

 www.wresources.co.uk

Simple Investments - Broker

Gable Communications

Andy Thacker / Nick Emerson

Justine James

T: +44 (0) 1483 413500

T: +44 (0) 20 7193 7463

www.simple-investments.co.uk

M: +44 (0) 7525 324431

 

 

About La Parrilla

 

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site is accessed directly from the highway along a 3km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The historic mine resource estimated by SRK in 2008 is 36.0m tonnes at 0.09% WO3 making it one of the largest tungsten deposits in the western world.

The technical design of the La Parrilla tailings project has now been finalised and approval documents submitted to the mining authorities. All approvals are expected to be granted by the end of Q3 2012. Annual plant feed will be 330,000 tonnes and annual production is anticipated to be 28,000 MTU Tungsten (W) and 26 tonnes Tin (Sn), which will deliver over €7million per annum in revenue at current tungsten and tin prices. The tailings project is expected to be in production in H2 2013.

The price of tungsten has increased rapidly over the last 3 years by more than double. The La Parrilla tailings deposit and tungsten mine development offer a low cost, high margin resource development opportunity for W Resources.

 

Sampling, Assaying and Quality Assurance / Quality Control (QA/QC) Measures

 

Drill sample intervals are reported as metres (m) down hole. True widths of mineralised intersections have been calculated assigning an average dip of the mineralised zones of 40º for hole IP-04 and 45º for hole IP-03. All drill core is transported by the Company personnel from drill site to a nearby secure storage facility for logging, by an experienced geologist, and sampling. The core is halved using a rotary diamond blade core saw, with one half of the core sent for analysis, while the other half is retained in the core boxes for reference. Sampling is mainly carried out over two metre intervals.

All half-core samples are sent for preparation to ALS Minerals facility in Seville (Spain). The resulting pulps are shipped to their laboratory in Vancouver (Canada) for assay using the ME-MS81 method (38 elements by lithium borate fusion and ICP-MS). Samples exceeding the upper detection limit (10,000 ppm W) are re-assayed by the lithium borate fusion and XRF determination ME-XRF10 method. Tungsten assays are reported by ALS Minerals as W and converted to WO3 using a factor of 1.26108.

Reference samples (blanks, duplicates and certified standards) are routinely inserted in each sample batch as quality control measure in addition to the laboratory's own internal QA/QC standards and duplicates.

 

Technical information in this report has been prepared in accordance with the JORC Code and approved for inclusion by Mr Fernando de la Fuente, who is a "qualified person" in respect of the AIM Rules for Companies with over 37 years experience in the Exploration and Mining Geology industry. Mr de la Fuente holds a B.Sc. in Geology and a MSc in Geology from the University of Granada in Spain. He is also a member of the Spanish College of Geologists (Number 49), the Spanish Society of Mineralogy, founder member of the Spanish Society of Geology, member of the Spanish Association of Applied Geology to Mineral Deposits, member of the Society for Mining, Metallurgy and Exploration, Inc., member of PDAC.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSFLFLWFESELA
Date   Source Headline
7th Oct 201511:02 amRNSCAA / Portalegre Licence Expanded
30th Sep 20159:00 amRNSHalf Yearly Report
29th Sep 201511:01 amRNSLa Parrilla FTM Development Update
9th Sep 20159:17 amRNSHolding(s) in Company
26th Aug 20152:49 pmRNSChanges to Significant Shareholders
10th Aug 20157:00 amRNSRégua drilling update
14th Jul 20157:00 amRNSEnvironmental Approval for La Parrilla
10th Jul 20157:00 amRNSFast Track Mine Infill Drilling Advances
26th Jun 201511:11 amRNSPlacing and Appointment of Broker
19th Jun 20151:30 pmRNSResult of AGM
16th Jun 20157:00 amRNSLa Parrilla Definition Study Completed
5th Jun 20157:00 amRNSFast Track Mine Infill Drilling Advances
26th May 20157:01 amRNSNotice of AGM
22nd May 20157:00 amRNSFinal Results for the Year Ended 31 December 2014
12th May 20157:00 amRNSUpdate on CAA / Portalegre
28th Apr 20157:00 amRNSExcellent Drilling Results Continue at Regua
13th Apr 20159:51 amRNSBergen Facility Fully Repaid
26th Mar 20152:17 pmRNSAdditional Placing of 200,000 GBP
20th Mar 20158:39 amRNSCorrection: Repayment of Bergen Facility
20th Mar 20157:00 amRNSRepayment of Bergen Facility and Placing
9th Mar 20159:28 amRNSRegua Project Update
13th Feb 201510:59 amRNSLa Parrilla Mine and Tailings Update
6th Feb 20159:25 amRNSChanges to Significant Shareholders
20th Jan 20151:09 pmRNSPlacing to Raise £1.4m
29th Dec 201412:31 pmRNSDirector Dealing
24th Dec 201411:11 amRNSIssue of Equity
24th Dec 20147:00 amRNSLa Parrilla Operations and Development Update
18th Dec 20147:00 amRNSDirectorate Change
15th Dec 20147:00 amRNSLa Parrilla Mine Connects to Spanish Grid
4th Dec 20147:00 amRNSCAA / Portalegre Drilling Campaign Commences
24th Nov 20147:00 amRNSRegua Development Campaign Commences
19th Nov 20147:00 amRNSLa Parrilla Tailings Plant Improvement Update
4th Nov 20147:00 amRNSDirector Dealing
30th Oct 20147:00 amRNSStrong Trenching Exploration Results
27th Oct 20147:00 amRNSBergen First Closing Completed
22nd Oct 20147:00 amRNSTrading and operations update
16th Oct 201410:56 amRNSConvertible security & private placement facility
30th Sep 20147:00 amRNSInterim results to 30 June 2014
17th Sep 20147:00 amRNSTarouca Drilling Programme Completion
15th Sep 20141:15 pmRNSLa Parrilla Tailings Update
8th Sep 201410:43 amRNSLa Parrilla mine development plan
11th Aug 20147:00 amRNSFirst Tungsten Shipment Cash Proceeds
8th Aug 20145:20 pmRNSDirector Shareholding
29th Jul 20141:35 pmRNSPlacing to raise £1.2 million
28th Jul 20147:00 amRNSTarouca Drilling Update
10th Jul 20147:00 amRNSProduction Ramp-up at La Parrilla Tailings
27th Jun 20143:32 pmRNSShare transfer
23rd Jun 20147:00 amRNSTrial Mining Licence Awarded at Régua
20th Jun 201412:41 pmRNSResult of AGM
27th May 20144:44 pmRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.