The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Successful Flow Tests & First Production Gas

26 Sep 2017 07:00

RNS Number : 7610R
Victoria Oil & Gas PLC
26 September 2017
 

26 September 2017

 

Victoria Oil & Gas Plc

("VOG" or "the Company")

 

Successful Flow Tests and First Production Gas from Logbaba Well La-107

 

· Well La-107 has been completed and classified as production well

· Testing of the well has been completed with a maximum flowrate of

o 54 mmscf/d maximum flowrate through a 70/64ths inch choke

o 146mmscf/d Absolute Open Flow ("AOF") potential

· Well now connected to Logbaba Gas Processing Plant and first gas flowed to the Processing Plant 22 September 2017

· Drilling rig skidded back to La-108 and operations to side track this well have commenced-completion scheduled for Q4 2017

 

Following the drilling update of 17 August 2017, Victoria Oil & Gas Plc is pleased to announce successful flow tests and first production gas from the Logbaba La-107 well. The well reached target depth of 3,180m, the base of the Logbaba Formation, encountering a total of 58m of net gas bearing sands in the Upper and Lower Logbaba Formations.

 

Following the installation of the production completion and production tree, La-107 was perforated and flow tested to a maximum rate of 54 mmscf/d on a 70/64ths inch choke, with a stabilised flowing wellhead pressure of 2,951psig. The multi-rate test results indicate that the well has an AOF potential of 146mmscf/d; this is considerably better than expected and compares very well to La-105 which had an initial AOF of 89mmscf/d.

 

After conducting clean up and flow testing operations the well was connected to the Logbaba Gas Processing Plant and first gas flowed to the processing plant for sales on 22 September 2017.

 

The drilling rig was released from La-107 on 3 September 2017 and skidded to La-108 to resume drilling operations on that well. Following procedures to re-enter the well, side-track operations commenced on La-108 on 10 September 2017. The side-track is planned to re-drill the 8½" hole section which was previously lost, where more than 100m of net gas-bearing sands were encountered at intervals between the top of the Logbaba Formation at 2,107m MD and 2,760m MD.

 

The combined testing and drilling operations on both La-107 and La-108 were planned and conducted under industry recognized Simultaneous Operations Procedures (SIMOPs) to ensure a safe, efficient and successful outcome of a complex operation.

 

Ahmet Dik, VOG CEO said, "These flow tests exceeded our expectations and La-107 is considered a production well. We can now move to finalise long term gas supply contracts with high volume customers. Our next task is the safe and successful completion of the La-108 side track and to capture as much as the 100m of sands in that well as possible. These wells have been difficult and expensive to drill and the La-107 success is a credit to our operations and drilling teams."

 

The Board is pleased to confirm that the Company`s Interim Accounts will be released on, or before, 30 September 2017.

 

 

 

Sam Metcalfe, the Company's Subsurface Manager has reviewed and approved the technical information contained in this announcement.

 

This announcement contains inside information.

 

 

For further information, please visit www.victoriaoilandgas.com or contact: 

 

Victoria Oil & Gas Plc

Kevin Foo / Laurence Read Tel: +44 (0) 20 7921 8820

 

Strand Hanson Limited

Rory Murphy / Angela Hallett / Stuart Faulkner Tel: +44 (0) 20 7409 3494

 

Shore Capital Stockbrokers Limited (Joint Broker)

Mark Percy / Toby Gibbs (corporate finance) Tel: +44 (0) 207 408 4090

Jerry Keen (corporate broking)

 

FirstEnergy Capital LLP (Joint Broker)

Jonathan Wright / David van Erp Tel: +44 (0) 207 448 0200

 

Camarco (Financial PR)

Billy Clegg Tel: +44 (0) 203 757 4983

Nick Hennis Tel: +44 (0) 203 781 8330

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLOKPDBABKDBCB
Date   Source Headline
6th May 20104:35 pmRNSPrice Monitoring Extension
5th May 20107:00 amRNSLetter to Shareholders
28th Apr 20104:35 pmRNSPrice Monitoring Extension
23rd Apr 20107:00 amRNSNotice of General Meeting
21st Apr 20107:00 amRNSLogbaba Update
23rd Mar 20109:19 amRNSDirectorate Change
9th Mar 20107:00 amRNSTest Results
1st Mar 20107:00 amRNSPlacing and Directors' share interests
26th Feb 20103:05 pmRNSHalf Yearly Report
17th Feb 20107:00 amRNSLetter to Shareholders
10th Feb 20107:00 amRNSAdditional Listing
9th Feb 20107:00 amRNSLogbaba Update
4th Feb 20107:00 amRNSResults at Logbaba Natural Gas Project, Cameroon
19th Jan 20107:00 amRNSUpdate on Logbaba Natural Gas Project, Cameroon
6th Jan 20107:00 amRNSLogbaba Update
31st Dec 200912:40 pmRNSSecond Price Monitoring Extn
31st Dec 200912:35 pmRNSPrice Monitoring Extension
18th Dec 20091:01 pmRNSResult of AGM
18th Dec 20098:00 amRNSOperations update
25th Nov 20097:00 amRNSFinal Results
24th Nov 20092:29 pmRNSAdditional Listing
16th Nov 20097:00 amRNSLogbaba Update
30th Oct 20091:24 pmRNSResignation of Director
26th Oct 20099:26 amRNSLetter to Shareholders
26th Oct 20097:00 amRNSExercise of Warrants
15th Oct 20095:45 pmRNSChange of Name of Nominated Adviser
1st Oct 200910:09 amRNSAdditional Listing & Director Shareholding
1st Oct 200910:04 amRNSDirectorate Change
1st Sep 200910:30 amRNSOperational Update
28th Aug 20097:00 amRNSPlacing of New Shares
26th Aug 20097:00 amRNSAdditional Listing and Exercise of Warrants
25th Aug 200911:13 amRNSHolding(s) in Company
19th Aug 20097:00 amRNSOperational Update
17th Aug 20091:16 pmRNSAdditional Listing
6th Aug 20097:00 amRNSAdditional Listing
28th Jul 20098:46 amRNSWest Medvezhye Project Update
24th Jul 20097:00 amRNSCompletion of Placing, Issue of New Shares
20th Jul 200910:15 amRNSProject Update
16th Jul 20097:00 amRNSHoldings in Company
15th Jul 20099:50 amRNSLetter to Shareholders
13th Jul 20091:38 pmRNSResult of EGM
9th Jul 20097:00 amRNSDrilling Contracts and Funding Package
29th Jun 20092:43 pmRNSHolding(s) in Company
19th Jun 20099:41 amRNSHolding(s) in Company
17th Jun 20097:00 amRNSFunding Package and EGM
12th Jun 20092:40 pmRNSResponse to press speculation
12th Jun 200912:35 pmRNSAdditional Listing
3rd Jun 20097:00 amRNSPassive Seismic Survey
27th May 200910:49 amRNSAdditional Listing
12th May 20097:00 amRNSAdditional Listing & Amendment to Shareholder Loan

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.